Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Truck Restrictions on I-15
I-15
Between Exit 63: Portneuf Road and Exit 71: Interstate 15 Business (Pocatello). The roadway is reduced to one lane. The left lane is closed. Road construction work is in progress. The road is being repaved. There is work on the shoulder. People are working in the median. Speed restrictions are in force. There is a width limit in effect. Speed limit 55 MPH . Width limit 12'0". From 5:00AM MDT to 4:00PM MDT on weekdays. Until August 31, 2017 at about 6:00PM MDT.

Web Comment: This road construction project is building median crossovers, for future bridge repairs. Beginning at milepost 66, north of exit 65, South 5th Avenue and exit 71, Pocatello Creek interchange. Please use caution around crews and equipment.
Last updated on May 18
Between Exit 72: I-86 and Exit 89: US 91; Interstate 15 Business (near Fort Hall). The roadway is reduced to one lane. The left lane is closed. Road construction work is in progress. The road is being repaved. Look out for flaggers. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 15'0". Until August 31, 2017 at about 8:00PM MDT.

Web Comment: Crossovers in effect on I-15, between milepost 76, five miles north of Pocatello Creek Exit 71, and milepost 82, two miles north of Fort Hall Exit 80. Use caution around crews and equipment.
Last updated on May 17
Between Exit 98: Lambert Road and Northbound Blackfoot Rest Area (3 to 4 miles north of the Blackfoot area). The roadway is reduced to one lane. The bridge is closed. The intersecting road is closed. A lane is closed intermittently. There are alternating lane closures. Bridge construction work is in progress. A detour is in operation. Follow the detour signs. From 5:00AM MDT to 3:30PM MDT on Monday, Tuesday, Wednesday and Thursday. Until tomorrow at about 5:30PM MDT.

Web Comment: Bridge closed over I-15 at milepost 99.49, North Lavaside Road Bridge, between mileposts 99, one mile north of Lambert Road, Exit 98, and milepost 100, North Blackfoot Rest Area. I-15 reduced to one lane. Use caution around crews and equipment.
Last updated on May 17
Between Southbound Blackfoot Rest Area (7 miles north of the Blackfoot area) and Exit 113: US 26; Interstate 15 Business (3 miles south of the Idaho Falls area). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. There is work on the shoulder. People are working in the median. Speed restrictions are in force. There is a width limit in effect. Speed limit 60 MPH . Width limit 12'0". Until August 19, 2017 at about 8:00PM MDT.

Web Comment: Road construction on I-15, between milepost 103, two miles north of the southbound Blackfoot Rest Area, and milepost 112, Bingham County Line. Use caution around crews and equipment.
Last updated on May 17
Between Exit 172: Sheep Station Road (1 mile south of the Spencer area) and Exit 180: Spenser Road (Spencer). The right lane is closed. The road is rough. There is work on the shoulder. Reduce your speed. Observe speed limits. There is a width limit in effect. For the next week.

Web Comment: Monday-Thursday 16 feet width limit. Friday-Sunday 22 feet width limit in effect.
Last updated on May 10