Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 95
US 95: Work on the shoulder, width limit in effect.

Between Sand Road and US 20 (1 mile south of the Parma area). There is work on the shoulder. There is a width limit in effect. Width limit 12'0". From 7:00AM MDT to 7:00PM MDT on weekdays. Until today at about 7:00PM MDT.

Web Comment: Temporary traffic control will only be in place during working hours: typically 7:00 am to 7:00 pm. Speeds will be reduced to 55 mph in advance of the work area. Travels lanes will be shifted and channelized thru the work zone.

Last updated on May 23
US 95 in both directions: Utility work, truck restrictions in force, truck detour in operation.

Between Lakeshore Drive (near Sandpoint) and Exit 475: US 2; ID 200 (Ponderay). Utility work is in progress. Truck restrictions are in force. A truck detour is in operation. Until October 1, 2018 at about 6:00PM PDT.

Web Comment: Exit 473 Northbound and Southbound Exits Closed to Trucks, Use Exit 475.

More Info: Truck detour info

Last updated on May 22
US 95 in both directions: Roadway reduced to two lanes, construction work, narrow lanes.

Between Monroe Street and Chinook Street (near Bonners Ferry). The roadway is reduced to two lanes. Look out for construction work. Be aware of narrow lanes. Truck speed limit 25 MPH. Width limit 11'0". Until October 1, 2018 at about 11:59PM PDT.

Web Comment: 11' painted lane widths : actual physical width 22'6"

Last updated yesterday at 4:51pm PDT
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 95
Map of Reports on US 95 Between Sand Road and US 20 (1 mile south of the Parma area). There is work on the shoulder. There is a width limit in effect. Width limit 12'0". From 7:00AM MDT to 7:00PM MDT on weekdays. Until today at about 7:00PM MDT. Between Railroad Lane (near Payette) and East Commercial Street (near Weiser). Road construction work is in progress. The road is being repaved. Expect delays. The roadway is reduced to one lane. Look out for flaggers. A pilot car is in operation. Speed restrictions are in force. Speed limit 55 MPH. Expect 30 - minute delays. From 7:00AM MDT to 5:00PM MDT daily. Until October 17, 2018 at about 5:00PM MDT. Between Sanders-Emida Road and Desmet Road (2 to 4 miles south of the Tensed area). There is work on the shoulder due to road construction work. Between Lakeshore Drive (near Sandpoint) and Exit 475: US 2; ID 200 (Ponderay). Utility work is in progress. Truck restrictions are in force. A truck detour is in operation. Until October 1, 2018 at about 6:00PM PDT. Between Monroe Street and Chinook Street (near Bonners Ferry). The roadway is reduced to two lanes. Look out for construction work. Be aware of narrow lanes. Truck speed limit 25 MPH. Width limit 11'0". Until October 1, 2018 at about 11:59PM PDT.
US 95: Work on the shoulder, width limit in effect.
US 95 in both directions: Utility work, truck restrictions in force, truck detour in operation.
US 95 in both directions: Roadway reduced to two lanes, construction work, narrow lanes.
US 95: Lewiston Hill
US 95: Bonners Ferry
US 95: Whitebird Hill
Bonners Ferry Weigh Station
Lewiston Weigh Station
Marsing Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations