Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 95
US 95 in both directions: Bridge maintenance operations, roadway reduced to one lane.
Between John Day Creek Road and Slate Creek Road (11 miles north of the Riggins area). Bridge maintenance work is in progress. The roadway is reduced to one lane. Expect 15 - minute delays.. Width limit 14'0". Until May 16.

Web Comment: Wide loads can be accommodated by contacting James Heilman at 208-660-7700 ahead of time. Temporary traffic signals will be in place 24 hours/day, 7 days a week.
Last updated on April 29
US 95 in both directions: Road construction, delays, look out for flaggers.
Between Sky Line Drive and Martin Road (4 to 8 miles south of the Tensed area). Road construction work is in progress. Expect delays. Look out for flaggers. Speed limit 35 MPH . Width limit 11'0". Until October 31.
Last updated on April 29
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 95
Map of Reports on US 95 Between Salmon Drive and Lucile Road (near Riggins). The normal traffic lanes have been restored. Reduce your speed. Until May 9. Between Sky Line Drive and Martin Road (4 to 8 miles south of the Tensed area). Road construction work is in progress. Expect delays. Look out for flaggers. Speed limit 35 MPH. Width limit 11'0". Until October 31.
US 95 in both directions: Bridge maintenance operations, roadway reduced to one lane.
US 95 in both directions: Road construction, delays, look out for flaggers.
US 95: Lewiston Hill
US 95: Bonners Ferry
US 95: Whitebird Hill
Bonners Ferry Weigh Station
Lewiston Weigh Station
Marsing Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations