Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-15
I-15 southbound: Roadway reduced to one lane, road maintenance operations, bridge maintenance operations, work on the shoulder, width limit in effect, if weather permits.
Between Exit 71: Interstate 15 Business and Exit 67: US 30; Interstate 15 Business (Pocatello). The roadway is reduced to one lane. Road maintenance work is in progress. Bridge maintenance work is in progress. There is work on the shoulder. There is a width limit in effect. If weather permits. Width limit 14'0". From 11:00AM MST to 3:30PM MST on Monday and from 7:30AM MST to 3:30PM MST on Tuesday. Until today at about 3:30PM MST.

Web Comment: This project on I-15, between mileposts 70, and 68, near the Pocatello Creek Road Interchange #71, will repair a pothole in the joint of the bridge deck over Buckskin Road in Pocatello. Use caution around crews and equipment.
Last updated yesterday at 10:51am MST
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-15
Map of Reports on I-15 Between Exit 71: Interstate 15 Business and Exit 67: US 30; Interstate 15 Business (Pocatello). The roadway is reduced to one lane. Road maintenance work is in progress. Bridge maintenance work is in progress. There is work on the shoulder. There is a width limit in effect. If weather permits. Width limit 14'0". From 11:00AM MST to 3:30PM MST on Monday and from 7:30AM MST to 3:30PM MST on Tuesday. Until today at about 3:30PM MST.
I-15 southbound: Roadway reduced to one lane, road maintenance operations, bridge maintenance operations, work on the shoulder, width limit in effect, if weather permits.
Inkom Weigh Station
Sage Junction Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations