Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 95
US 95 in both directions: Road construction, delays, look out for flaggers.
Between Sky Line Drive and Martin Road (4 to 8 miles south of the Tensed area). Road construction work is in progress. Expect delays. Look out for flaggers. Speed limit 35 MPH . Width limit 11'0". Until October 31.
Last updated on May 27
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 95
Map of Reports on US 95 Between White Bird Creek Bridge and White Bird Hill Summit (5 miles north of the White Bird area). Road construction work is in progress. The road is being repaved. Look out for flaggers. Expect 15 - minute delays. From 6:00AM PDT to 6:00PM PDT on weekdays. Until July 6. Between Sky Line Drive and Martin Road (4 to 8 miles south of the Tensed area). Road construction work is in progress. Expect delays. Look out for flaggers. Speed limit 35 MPH. Width limit 11'0". Until October 31.
US 95 in both directions: Road construction, delays, look out for flaggers.
US 95: Lewiston Hill
US 95: Bonners Ferry
US 95: Whitebird Hill
Bonners Ferry Weigh Station
Lewiston Weigh Station
Marsing Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations