Truck Restrictions on ID 55
ID 55
Between Latah Drive and Cassia Street (near Nampa). Road construction work is in progress. The roadway is reduced to two lanes. Speed restrictions are in force. Expect delays. Consider using an alternate route. There is a width limit in effect. Speed limit 35 MPH . Width limit 12'0". From 8:00AM MDT to 6:00PM MDT on weekdays. Until November 2.

Comment: Expect ongoing traffic delays. Consider using alternate routes. Traffic is running on temporary pavement on the south side of Karcher and the west side of Middleton. A temporary traffic signal is in operation. Work continues on the north side of Karcher Rd between Latah Dr and Sundance Rd, and on the east side of Middleton Rd between Aires Dr and Hailey Ave. A concrete barrier rail separates traffic from the active work zone. 7/2/15 – Permanent traffic signal equipment will be installed Thursday 7/2/15. Flaggers will direct traffic through the Karcher/Middleton Intersection during installation. Please consider using alternate route. 7/7/15 Planned closure/detour – The Karcher/Middleton intersection will be closed from 7 pm on July 7th until 8 am on July 8th for installation of storm sewer lines across Karcher Road between Sundance Road and Latah Drive.
Last updated on July 6
At Middleton Road (Nampa). The road is closed to traffic. A detour is in operation. Until today at about 7:00AM MDT.

Comment: The intersection of Idaho 55 (Karcher Road) and Middleton Road in Nampa will be closed July 7th from 7 p.m. to 7 a.m. July 8th for sewer construction activities. Signage will provide detour information for local residents in the project area. Drivers should anticipate delays and are encouraged to leave early and slow down.
Last updated on June 30
Between Dam Road and Smalley Road (near Cascade). Bridge construction work is in progress. There is a width limit in effect. Speed restrictions are in force. The intersecting road is closed. Speed limit 25 MPH . Width limit 11'0". Expect 30 - minute delays.. From 7:00AM MDT to 12:00PM MDT on Fridays and from 7:00AM MDT to 7:00PM MDT on Mondays, Tuesdays, Wednesdays and Thursdays. Until October 21.

Comment: This project replaces the existing N. Fork Payette River Bridge at the north end of the City of Cascade. There will be one 11’ lane open in each direction at all times, except for the occasional temporary reduction to one lane, controlled by flaggers. Speed limit through the project limits is 25 MPH.
Last updated on July 6
Between Long View Road (1 mile north of the McCall area) and Woodland Road (3 miles south of the New Meadows area). Road construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Expect delays. Speed restrictions are in force. Speed limit 35 MPH . Width limit 12'0". Expect 15 - minute delays.. From 7:00AM MDT to 12:00PM MDT on Fridays and from 7:00AM MDT to 7:00PM MDT on Mondays, Tuesdays, Wednesdays and Thursdays. Until October 21.

Comment: 12' width restriction in effect 24/7. Work will be completed Monday-Thursday from 7 a.m. to 7 p.m. and Friday until noon. In addition, rock blasting will require several closures of up to two hours each. Blasting will occur between 6 p.m. and 10 p.m. ITD will work on removing rock and clearing trees in order to smooth several curves. ITD will provide five days advanced notice for rock blasting.
Last updated on July 6