Truck Restrictions on US 30
US 30
Between I-86 and East County Road (near Arbon Valley). The roadway is reduced to one lane. Bridge maintenance work is in progress. Truck restrictions are in force. There is a width limit in effect. Speed restrictions are in force. Width limit 12'0". Speed limit 65 MPH . Until November 30.

Comment: Bridge work will be done on US-30 between mileposts 330.82 and 330.93, at the I-86 Interchange east and westbound ramps. Work will be done during daylight hours, 7:00 a.m. to 6:00 p.m. The 12 foot width restriction is in effect 24 hours a day, 7 days a week. Use caution around crews and equipment.
Last updated on August 14
Between Main Street - Hawthorne Road and Cedar Street (Pocatello). There is a height limit in effect. Height limit 13'6".

Comment: This is a permanent height restriction within the city limits of Pocatello in both east and westbound lanes at the railroad bridge on Garret Way between Main Street and Cedar Street at milepost 334.15.
Last updated on August 13
Between Jefferson Street (near Montpelier) and Dingle Road - Keetch Road (3 miles east of the Montpelier area). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Speed restrictions are in force. There is a width limit in effect. Look out for flaggers. Expect delays. Consider using an alternate route. If weather permits. Speed limit 55 MPH . Width limit 17'0". From 7:00AM MDT to 7:00PM MDT daily. Until September 13.

Comment: This paving project is on US-30 between milepost 435, near Jefferson Street in Montpelier, and milepost 438, near Dingle Road. For wide loads, please contact Mike Stoddart, at 208-201-3323.
Last updated on August 13
Between Banks Valley Road and Pegram Road (8 miles east of the Montpelier area). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Look out for flaggers. Consider using an alternate route. If weather permits. Speed limit 55 MPH . Width limit 12'0". Expect 15 - minute delays.. From 7:00AM MDT to 5:00PM MDT daily. Until September 30.

Comment: This paving project is on US-30 between mileposts 441, near Banks Valle Road near Montpelier, and milepost 447, near Pegram Road. For wide loads, please contact Mike Stoddart, at 208-201-3323