Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 30
Between River Road and Idaho Power Road (2 miles west of the Hagerman area). Bridge maintenance work is in progress. Road maintenance work is in progress. The roadway is reduced to one lane. Look out for temporary traffic lights. There is a width limit in effect. Width limit 11'0". Expect 5 - minute delays.. From 7:00AM MDT to 7:00PM MDT on weekdays. Until August 23.

Comment: Bridge maintenance to repair guardrail, driving surface, and paint at Malad River Bridge (milepost 177.4).
Last updated on June 6
Between Locust Street and Deere Street (Twin Falls). The road is being repaved. The roadway is reduced to one lane. There is a width limit in effect. Width limit 12'0". From 7:00AM MDT to 7:00PM MDT on weekdays. Until Friday, at about 7:00PM MDT.

Comment: this is a private company job by Earthworks, and the foreman's name is JD Borges, between milepost 219 and 220 on US 30
Last updated on May 31
Between Main Street - Hawthorne Road and Cedar Street (near Pocatello). There is a height limit in effect. Height limit 13'6".

Comment: This is a permanent height restriction within the city limits of Pocatello in both east and westbound lanes at the railroad bridge on Garret Way between Main Street and Cedar Street at milepost 334.15.
Last updated on June 7
Between The West Lava Hot Springs City Limits and Fish Creek Summit (3 miles east of the Lava Hot Springs area). The roadway is reduced to one lane. A lane is closed intermittently. Road construction work is in progress. The road is being repaved. Speed restrictions are in force. There is a width limit in effect. Speed limit 45 MPH . Width limit 12'0". Until July 15.

Comment: This paving and bridge work project is on US-30 between milepost 371.89, Lava Hot Springs City Limits, and milepost 375.67, Caribou County Limits. Traffic restrictions in effect 24 hours a day, seven days a week. Motorists should use caution around crews and equipment.
Last updated on June 7
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 30
Map of Reports on US 30 Between Locust Street and Deere Street (Twin Falls). The road is being repaved. The roadway is reduced to one lane. There is a width limit in effect. Width limit 12'0". From 7:00AM MDT to 7:00PM MDT on weekdays. Until Friday, at about 7:00PM MDT. Between The West Lava Hot Springs City Limits and Fish Creek Summit (3 miles east of the Lava Hot Springs area). The roadway is reduced to one lane. A lane is closed intermittently. Road construction work is in progress. The road is being repaved. Speed restrictions are in force. There is a width limit in effect. Speed limit 45 MPH. Width limit 12'0". Until July 15. Between First West Street and Airport Bypass Road (near Soda Springs). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Look out for flaggers. Consider using an alternate route. From 7:00PM MDT to 7:00AM MDT on weekdays. Until July 31.
US 30: Bridge maintenance operations, road maintenance operations, roadway reduced to one lane, temporary traffic lights, width limit in effect.
US 30: Paving operations, roadway reduced to one lane, width limit in effect.
US 30 in both directions: Height limit in effect.
US 30 in both directions: Roadway reduced to one lane, intermittent lane closure, road construction, paving operations, speed restrictions in force, width limit in effect.
US 30: Fish Creek
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup Truck Ramp Truck Ramp