Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-15
I-15 in both directions: Roadway reduced to one lane, road construction, paving operations, bridge maintenance operations, work on the shoulder, work in the median, look out for flaggers, speed restrictions in force, width limit in effect.

Between Exit 36: US 91; Hawkins Road (3 miles south of the Arimo area) and Exit 57: Interstate 15 Business (near Inkom). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Bridge maintenance work is in progress. There is work on the shoulder. People are working in the median. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 12'5". Until October 15, 2018 at about 6:00PM MDT.

Web Comment: Four bridges to undergo maintenance on I-15, between milepost 35.91, south of Virginia Interchange, and milepost 55.90, South of Inkom. The Portneuf River Bridge at milepost 55.61, McCammon Interchange at milepost 47.16, Jensen Road Interchange at milepost 44.08, and Virginia Interchange at milepost 35.91. Three crossovers will be built at mileposts 55.2, 56.4, and 58.3. Single lane traffic in both directions during crossover construction. Use caution around crews and equipment.

Last updated on April 16
I-15 northbound: Roadway reduced to one lane, right lane closed, road construction, bridge maintenance operations, delays, speed restrictions in force, width limit in effect.

Between US 30 and The Inkom Port of Entry (near Inkom). The roadway is reduced to one lane. The right lane is closed. Road construction work is in progress. Bridge maintenance work is in progress. Expect delays. Speed restrictions are in force. There is a width limit in effect. Expect 15 - minute delays. Speed limit 65 MPH. Width limit 12'5". Until May 10, 2018 at about 5:00PM MDT.

Web Comment: Bridge rehabilitation work on I-15, between milepost 56, South Inkom, and milepost 58, North Inkom. Lane crossovers will be used. Use caution around crews and equipment.

Last updated on April 16
I-15: Paving operations, roadway reduced to two lanes, left lane closed, road construction.

Between Exit 80: Fort Hall (2 miles north of the Fort Hall area) and Exit 93: US 26 (1 mile south of the Blackfoot area). The road is being repaved. The roadway is reduced to two lanes. The left lane is closed. Road construction work is in progress. Speed limit 65 MPH. Width limit 15'0". Until July 4, 2018 at about 11:59PM MDT.

Last updated today at 9:59am MDT
I-15 northbound: Right lane closed, width limit in effect, rough road.

Between Exit 172: Sheep Station Road and Exit 180: Spenser Road (1 mile south of the Spencer area). The right lane is closed. There is a width limit in effect. The road is rough. Width limit 14'0". Until May 5, 2018 at about 11:59PM MDT.

Web Comment: At milepost 178, 1 mile south of Spencer. if over width call 208-705-6624 and give four hour notice

Last updated on April 4
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-15
Map of Reports on I-15 Between Exit 36: US 91; Hawkins Road (3 miles south of the Arimo area) and Exit 57: Interstate 15 Business (near Inkom). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Bridge maintenance work is in progress. There is work on the shoulder. People are working in the median. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 12'5". Until October 15, 2018 at about 6:00PM MDT. Between US 30 and The Inkom Port of Entry (near Inkom). The roadway is reduced to one lane. The right lane is closed. Road construction work is in progress. Bridge maintenance work is in progress. Expect delays. Speed restrictions are in force. There is a width limit in effect. Expect 15 - minute delays. Speed limit 65 MPH. Width limit 12'5". Until May 10, 2018 at about 5:00PM MDT. Between Exit 80: Fort Hall (2 miles north of the Fort Hall area) and Exit 93: US 26 (1 mile south of the Blackfoot area). The road is being repaved. The roadway is reduced to two lanes. The left lane is closed. Road construction work is in progress. Speed limit 65 MPH. Width limit 15'0". Until July 4, 2018 at about 11:59PM MDT. Between Exit 150: Hamer Road (near Hamer) and Exit 167: ID 22 (5 miles south of the Dubois area). There is work on the shoulder. People are working in the median. Until April 30, 2018 at about 11:59PM MDT.
I-15 in both directions: Roadway reduced to one lane, road construction, paving operations, bridge maintenance operations, work on the shoulder, work in the median, look out for flaggers, speed restrictions in force, width limit in effect.
I-15 northbound: Roadway reduced to one lane, right lane closed, road construction, bridge maintenance operations, delays, speed restrictions in force, width limit in effect.
I-15: Paving operations, roadway reduced to two lanes, left lane closed, road construction.
I-15 northbound: Right lane closed, width limit in effect, rough road.
Inkom Weigh Station
Sage Junction Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations