I-15 in both directions: Roadway reduced to one lane, road construction, paving operations, work on the shoulder, work in the median, consider using an alternate route, speed restrictions in force, width limit in effect.
Between Exit 36: US 91; Hawkins Road (near Arimo) and Exit 57: Interstate 15 Business (near McCammon). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. There is work on the shoulder. People are working in the median. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH . Width limit 15'0". Until October 15, 2017 at about 8:00PM MDT.

Web Comment: This project on I-15 is between milepost 39, 1.5 miles south of Arimo City Limits, and milepost 48, one mile north of McCammon Exit 44. Work scheduled Monday through Saturday. Traffic restrictions is in effect 24 hours a day, 7 days a week. Use caution around crews and equipment.
Last updated on September 15
I-15 in both directions: Roadway reduced to one lane, intermittent lane closure, road construction, paving operations, bridge maintenance operations, work on the shoulder, work in the median, delays of uncertain duration, look out for flaggers, speed restrictions in force, width limit in effect.
Between US 30 (2 miles south of the Inkom area) and The Inkom Port of Entry (near Inkom). The roadway is reduced to one lane. A lane is closed intermittently. Road construction work is in progress. The road is being repaved. Bridge maintenance work is in progress. There is work on the shoulder. People are working in the median. Expect delays of uncertain duration. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 12'5". Until November 10, 2017 at about 5:00PM MDT.

Web Comment: This project is on I-15, between milepost 54, South Inkom, and milepost 59, Inkom Port of Entry. Crossovers are being utilized. Work will be done on the Rapid Creek and South Inkom Interchange bridges. Use caution around crews and equipment.
Last updated on September 15
I-15 in both directions: Roadway reduced to one lane, intermittent lane closure, work on the shoulder, work in the median, speed restrictions in force, width limit in effect.
Between US 30 (1 mile south of the Inkom area) and Exit 67: US 30; Interstate 15 Business (near Pocatello). The roadway is reduced to one lane. A lane is closed intermittently. There is work on the shoulder. People are working in the median. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH . Width limit 12'0". Until October 16, 2017 at about 11:59PM MDT.

Web Comment: This guardrail project is on I-15, between milepost 54.6, South Inkom, and milepost 64.12, three miles south of South 5th Avenue Exit 67. Guardrail work will be in conjunction with the I-15 bridge project between mileposts 54.9 and 58.6, then will extend to milepost 65. From mileposts 58 to 65, expect reduction down to one lane, not longer than a mile. Use caution around crews and equipment.
Last updated on September 15
I-15 in both directions: Roadway reduced to one lane, road construction, bridge construction, work on the shoulder, work in the median, consider using an alternate route, speed restrictions in force, width limit in effect, truck restrictions in force, drive with extreme caution.
Between Exit 63: Portneuf Road and Exit 71: Interstate 15 Business (Pocatello). The roadway is reduced to one lane. Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. People are working in the median. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Truck restrictions are in force. Drive with extreme caution. Speed limit 55 MPH . Width limit 12'0". Until October 31, 2017 at about 6:00PM MDT.

Web Comment: Bridge deck and structure repair on I-15, between milepost 65, two miles north of South 5th Avenue Exit 67, and milepost 71, Pocatello Creek Interchange. Single lane in both directions. Lane closures in effect 24 hours a day, seven days a week. Use extreme caution on entrance and exit ramps.
Last updated on September 15
I-15 in both directions: Roadway reduced to one lane, road construction, paving operations, look out for flaggers, consider using an alternate route, speed restrictions in force, width limit in effect.
Between Exit 80: Fort Hall (2 miles north of the Fort Hall area) and Exit 93: US 26 (1 mile south of the Blackfoot area). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Look out for flaggers. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 15'0". Until October 31, 2017 at about 7:00PM MDT.

Web Comment: Road work on I-15, between milepost 85.64, Sand Road, and milepost 89.16, Exit 89 near Fort Hall. Use caution around crews and equipment.
Last updated on September 15
I-15: Paving operations, alternating lane closures, speed restrictions in force, width limit in effect.
Between Exit 180: Spenser Road (Spencer) and The Montana State Line (11 miles north of the Spencer area). The road is being repaved. There are alternating lane closures. Speed restrictions are in force. There is a width limit in effect. Width limit 12'0". Until October 6, 2017 at about 11:59PM MDT.

Web Comment: Width limits is 12 feet when paving driving lane, wide loads call 208-705-6636 for scheduling. Speed reduced to 45 through 4 mile active work zone.
Last updated on August 29
Switch to Road Reports
Truck Restrictions on I-15
Map of Reports on I-15 Between The Utah State Line (12 miles south of the Malad City area) and Exit 31: ID 40; Downey Road (11 miles south of the Arimo area). Look out for mobile maintenance operations. There is work on the shoulder. People are working in the median. From 7:00AM MDT to 5:00PM MDT on Monday, Tuesday, Wednesday and Thursday. Until September 30, 2017 at about 5:00PM MDT. Between Exit 22: Colton Lane and Exit 31: ID 40; Downey Road (8 to 11 miles north of the Malad City area). The roadway is reduced to one lane. The left lane is closed. Road maintenance work is in progress. People are working in the median. Until September 30, 2017 at about 5:00PM MDT. Between Exit 36: US 91; Hawkins Road (near Arimo) and Exit 57: Interstate 15 Business (near McCammon). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. There is work on the shoulder. People are working in the median. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 15'0". Until October 15, 2017 at about 8:00PM MDT. Between US 30 (2 miles south of the Inkom area) and The Inkom Port of Entry (near Inkom). The roadway is reduced to one lane. A lane is closed intermittently. Road construction work is in progress. The road is being repaved. Bridge maintenance work is in progress. There is work on the shoulder. People are working in the median. Expect delays of uncertain duration. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 12'5". Until November 10, 2017 at about 5:00PM MDT. Between US 30 (1 mile south of the Inkom area) and Exit 67: US 30; Interstate 15 Business (near Pocatello). The roadway is reduced to one lane. A lane is closed intermittently. There is work on the shoulder. People are working in the median. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until October 16, 2017 at about 11:59PM MDT. Between Exit 63: Portneuf Road and Exit 71: Interstate 15 Business (Pocatello). The roadway is reduced to one lane. Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. People are working in the median. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Truck restrictions are in force. Drive with extreme caution. Speed limit 55 MPH. Width limit 12'0". Until October 31, 2017 at about 6:00PM MDT. Between Exit 80: Fort Hall (2 miles north of the Fort Hall area) and Exit 93: US 26 (1 mile south of the Blackfoot area). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Look out for flaggers. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 15'0". Until October 31, 2017 at about 7:00PM MDT. Between Exit 180: Spenser Road (Spencer) and The Montana State Line (11 miles north of the Spencer area). The road is being repaved. There are alternating lane closures. Speed restrictions are in force. There is a width limit in effect. Width limit 12'0". Until October 6, 2017 at about 11:59PM MDT.
I-15 in both directions: Roadway reduced to one lane, road construction, paving operations, work on the shoulder, work in the median, consider using an alternate route, speed restrictions in force, width limit in effect.
I-15 in both directions: Roadway reduced to one lane, intermittent lane closure, road construction, paving operations, bridge maintenance operations, work on the shoulder, work in the median, delays of uncertain duration, look out for flaggers, speed restrictions in force, width limit in effect.
I-15 in both directions: Roadway reduced to one lane, intermittent lane closure, work on the shoulder, work in the median, speed restrictions in force, width limit in effect.
I-15 in both directions: Roadway reduced to one lane, road construction, bridge construction, work on the shoulder, work in the median, consider using an alternate route, speed restrictions in force, width limit in effect, truck restrictions in force, drive with extreme caution.
I-15 in both directions: Roadway reduced to one lane, road construction, paving operations, look out for flaggers, consider using an alternate route, speed restrictions in force, width limit in effect.
I-15: Paving operations, alternating lane closures, speed restrictions in force, width limit in effect.
Inkom Weigh Station
Sage Junction Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup