Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 75
ID 75: Long term road construction, bridge construction, roadway reduced to two lanes, delays, speed restrictions in force, width limit in effect.
Between Broadway Run Road and Elkhorn Road; River Ranch Road (near Sun Valley). Look out for long term road construction work. Bridge construction work is in progress. The roadway is reduced to two lanes. Expect delays. Speed restrictions are in force. There is a width limit in effect. Speed limit 35 MPH . Width limit 14'0". Until September 15, 2017 at about 7:00PM MDT.

Web Comment: Bridge replacement project over Big Wood River south of Ketchum (milepost 126). Narrow lanes. Merge with caution. Project is in winter shutdown.
Last updated on May 16
ID 75: Major road construction, roadway reduced to one lane, delays, temporary traffic lights, width limit in effect.
Between Robinson Bar Road (15 miles north of the Stanley area) and Slate Creek Road (14 miles south of the Clayton area). Major road construction work is in progress. The roadway is reduced to one lane. Expect delays. Look out for temporary traffic lights. There is a width limit in effect. Expect 15 - minute delays.. Width limit 14'0". Until October 31, 2017 at about 5:00PM MDT.

Web Comment: Road reconstruction in the Pebble Beach area (milepost 206 to 208). For more information: https://flh.fhwa.dot.gov/projects/id/ketchum-challis/
Last updated on May 11
Switch to Road Reports
Truck Restrictions on ID 75
Map of Reports on ID 75 Between Broadway Run Road and Elkhorn Road; River Ranch Road (near Sun Valley). Look out for long term road construction work. Bridge construction work is in progress. The roadway is reduced to two lanes. Expect delays. Speed restrictions are in force. There is a width limit in effect. Speed limit 35 MPH. Width limit 14'0". Until September 15, 2017 at about 7:00PM MDT. Between Redfish Lake Road (near Stanley) and Squaw Creek Road (5 miles south of the Clayton area). Look out for large animals on the roadway. Between Redfish Lake Road (near Stanley) and Squaw Creek Road (5 miles south of the Clayton area). There is danger of a rock fall. Between Robinson Bar Road (15 miles north of the Stanley area) and Slate Creek Road (14 miles south of the Clayton area). Major road construction work is in progress. The roadway is reduced to one lane. Expect delays. Look out for temporary traffic lights. There is a width limit in effect. Expect 15 - minute delays. Width limit 14'0". Until October 31, 2017 at about 5:00PM MDT. Between East Fork Road and Malm Gulch Road (6 to 8 miles north of the Clayton area). The road is rough.
ID 75: Long term road construction, bridge construction, roadway reduced to two lanes, delays, speed restrictions in force, width limit in effect.
ID 75: Major road construction, roadway reduced to one lane, delays, temporary traffic lights, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations