Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-84
I-84: Road construction, bridge construction, work on the shoulder, work in the median, roadway reduced to one lane, speed restrictions in force, width limit in effect, detour in operation.
Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. People are working in the median. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. A detour is in operation. Speed limit 55 MPH . Width limit 12'0". Until October 1, 2015.

Comment: I-84 Loads over 12’ wide (westbound) are being detoured between exits 57 and 59 via Federal Way. I-84 loads over 12’ wide (eastbound) are being detoured off and on at the Gowen Road IC Ramps. This restriction will be in place until late October 2014.
Last updated on October 27
I-84 in both directions: Bridge maintenance operations, paving operations, roadway reduced to one lane, alternating lane closures, speed restrictions in force, width limit in effect.
Between Exit 182: ID 50 (5 miles west of the Hazelton area) and Exit 201: Kasota Road (3 miles east of the Hazelton area). Bridge maintenance work is in progress. The road is being repaved. The roadway is reduced to one lane. There are alternating lane closures. Speed restrictions are in force. There is a width limit in effect. Speed limit 55 MPH . Width limit 13'0". Until November 7.

Comment: Lane closures at five bridge locations from milepost 184 to 194. Use caution.
Last updated on October 20
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-84
Map of Reports on I-84 Between Exit 38: I-84B and Exit 46: Eagle Road (near Meridian). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to two lanes. The left lane is closed. Speed restrictions are in force. Speed limit 55 MPH. Until October 31, 2015. Between Exit 38: I-84B (Meridian) and I-184 (Boise). Road construction work is in progress. The roadway is reduced to three lanes. Expect changing traffic patterns. Speed restrictions are in force. Speed limit 55 MPH. Until tomorrow at about 11:59PM MDT. Between Exit 52: Orchard Street and Exit 57: Gowen Road (near Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. Speed limit 55 MPH. From 8:00PM MDT to 5:00AM MDT daily. Until December 1, 2015. Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. People are working in the median. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. A detour is in operation. Speed limit 55 MPH. Width limit 12'0". Until October 1, 2015. Between Exit 182: ID 50 (5 miles west of the Hazelton area) and Exit 201: Kasota Road (3 miles east of the Hazelton area). Bridge maintenance work is in progress. The road is being repaved. The roadway is reduced to one lane. There are alternating lane closures. Speed restrictions are in force. There is a width limit in effect. Speed limit 55 MPH. Width limit 13'0". Until November 7.
I-84: Road construction, bridge construction, work on the shoulder, work in the median, roadway reduced to one lane, speed restrictions in force, width limit in effect, detour in operation.
I-84 in both directions: Bridge maintenance operations, paving operations, roadway reduced to one lane, alternating lane closures, speed restrictions in force, width limit in effect.
East Boise Weigh Station
Cotterell Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations