Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-84
I-84: Road construction, work on the shoulder, roadway reduced to one lane, speed restrictions in force, width limit in effect.
Between The Oregon State Line (near Fruitland) and Exit 17: Sand Hollow (12 miles west of the Caldwell exit). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 14'0". Until October 31.

Comment: The normal operating hours for this project will be Monday through Friday, 6 AM to 8 PM from June 16th until October 31, 2014. Traffic will be placed into a two-way, opposing single lane configuration. Crossovers will be located at MP0.25, either side of IC 03, and west of IC 13. The Westbound on and off ramps at Exit 09, (US30) will be closed until early September. Motorists are advised to use alternate routes at Exit 03 or at Exit 13. Motorists are advised to use Exit 3, US95 and proceed north to US30. A signed detour will be posted to direct traffic to east to exit 13, where they will be directed over to the westbound direction.
Last updated on September 25
I-84: Road construction, bridge construction, work on the shoulder, work in the median, roadway reduced to one lane, speed restrictions in force, width limit in effect, detour in operation.
Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. People are working in the median. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. A detour is in operation. Speed limit 55 MPH . Width limit 12'0". Until October 1, 2015.

Comment: I-84 Loads over 12’ wide (westbound) are being detoured between exits 57 and 59 via Federal Way. I-84 loads over 12’ wide (eastbound) are being detoured off and on at the Gowen Road IC Ramps. This restriction will be in place until late October 2014.
Last updated on September 25
I-84 in both directions: Bridge maintenance operations, roadway reduced to one lane, speed restrictions in force, width limit in effect.
Between Exit 137 and Exit 141: I-84B; US 26 (near Bliss). Bridge maintenance work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 13'0". Until October 10.

Comment: Bridge resurfacing project on Union Pacific Railroad overpass west of Exit 141. Watch for trucks entering and exiting work zone. Wide loads must use I-84 business loop between Exits 137 and 141 through Bliss. Contractor: L&J Construction, 406-599-7776
Last updated on September 23
I-84: Road construction, right lane closed, width limit in effect, roadway reduced to one lane.
Between Exit 182: ID 50 and Exit 188: Valley Road (8 miles west of the Hazelton area). Road construction work is in progress. The right lane is closed. There is a width limit in effect. The roadway is reduced to one lane. Width limit 12'0". Until today at about 6:00PM MDT.
Last updated on September 22
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-84
Map of Reports on I-84 Between The Oregon State Line (near Fruitland) and Exit 17: Sand Hollow (12 miles west of the Caldwell exit). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 14'0". Until October 31. Between Exit 17: Sand Hollow and Exit 26: US 20 (2 miles west of the Caldwell exit). Road maintenance work is in progress. Reduce your speed. Between Exit 28: 10th Street and Exit 35: ID 55; Nampa Boulevard (near Caldwell). Road maintenance work is in progress. The roadway is reduced to one lane. The right lane is closed. Until today at about 3:30PM MDT. Between Exit 29: US 20; Franklin Road (Caldwell) and Exit 35: ID 55; Nampa Boulevard (near Nampa). Traffic is stop and go. Between Exit 29: US 20; Franklin Road and Exit 38: I-84B (near Nampa). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. Speed limit 55 MPH. Until October 10. Between Exit 38: I-84B and Exit 46: Eagle Road (near Meridian). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to two lanes. The left lane is closed. Speed restrictions are in force. Speed limit 55 MPH. Until October 31, 2015. Between Exit 38: I-84B (Meridian) and I-184 (Boise). Road construction work is in progress. The roadway is reduced to two lanes. Speed restrictions are in force. Speed limit 55 MPH. Until October 31. Between Exit 52: Orchard Street and Exit 57: Gowen Road (near Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. Speed limit 55 MPH. From 8:00PM MDT to 5:00AM MDT daily. Until December 1, 2015. Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. People are working in the median. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. A detour is in operation. Speed limit 55 MPH. Width limit 12'0". Until October 1, 2015. Between Exit 137 and Exit 141: I-84B; US 26 (near Bliss). Bridge maintenance work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 13'0". Until October 10.
I-84: Road construction, work on the shoulder, roadway reduced to one lane, speed restrictions in force, width limit in effect.
I-84: Road construction, bridge construction, work on the shoulder, work in the median, roadway reduced to one lane, speed restrictions in force, width limit in effect, detour in operation.
I-84 in both directions: Bridge maintenance operations, roadway reduced to one lane, speed restrictions in force, width limit in effect.
I-84: Road construction, right lane closed, width limit in effect, roadway reduced to one lane.
East Boise Weigh Station
Cotterell Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations