ID 162
Between Big Butte Road and Thorn Springs Road (4 to 9 miles west of the Kamiah area). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. Look out for flaggers. A pilot car is in operation. There is a width limit in effect. Expect 15 - minute delays.. Width limit 12'0". Until August 14.

Comment: Valley Paving & Asphalt, Inc. will begin a pavement restoration project on June 17th from Mount Zion Road to MP 15. Traffic will be escorted through the construction zone by pilot car. Motorists can anticipate delays up to 15 minutes. A 12 foot width restriction is in effect. Any loads wider than 12 foot need to contact Tom Riener at Valley Paving (208) 962-3314 beginning June 17, 2013 to make accommodations to move through the construction.
Last updated yesterday at 9:14am PDT
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on ID 162
Map of Reports on ID 162 Between Big Butte Road and Thorn Springs Road (4 to 9 miles west of the Kamiah area). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. Look out for flaggers. A pilot car is in operation. There is a width limit in effect. Expect 15 - minute delays. Width limit 12'0". Until August 14.
ID 162 in both directions: Road construction, paving operations, roadway reduced to one lane, look out for flaggers, pilot car in operation, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup Truck Ramp Truck Ramp