US 30 in both directions: Roadway reduced to one lane, bridge maintenance operations, truck restrictions in force, width limit in effect.
Between I-86 and East County Road (near Arbon Valley). The roadway is reduced to one lane. Bridge maintenance work is in progress. Truck restrictions are in force. There is a width limit in effect. Width limit 12'0". Until November 1.

Comment: Bridge work will be done on US-30 between mileposts 330.82 and 330.93, at the I-86 Interchange east and westbound ramps. Work will be done during daylight hours, 7:00 a.m. to 7:00 p.m. The 12 foot width restriction is in effect 24 hours a day, 7 days a week. Use caution around crews and equipment.
Last updated yesterday at 1:23pm MDT
US 30 in both directions: Height limit in effect.
Between Main Street - Hawthorne Road and Cedar Street (Pocatello). There is a height limit in effect. Height limit 13'6".

Comment: This is a permanent height restriction within the city limits of Pocatello in both east and westbound lanes at the railroad bridge on Garret Way between Main Street and Cedar Street at milepost 334.15.
Last updated on September 4
US 30 in both directions: Roadway reduced to one lane, road construction, paving operations, delays, look out for flaggers, consider using an alternate route, speed restrictions in force, width limit in effect, truck restrictions in force, if weather permits.
Between Banks Valley Road and Pegram Road (6 to 11 miles east of the Montpelier area). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Expect delays. Look out for flaggers. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Truck restrictions are in force. If weather permits. Speed limit 55 MPH . Width limit 12'0". Expect 15 - minute delays.. Until September 30.

Comment: This paving project is on US-30 between mileposts 441.5, Banks Valley Road approximately six miles from Montpelier, and milepost 447.277, Pegram Road. Width restriction in effect 24 hours a day, seven days a week. Loads over 12 feet are required to pass through during non-working hours, 7:00 p.m. to 7:00 a.m. Contact Corey Anderson at (208) 604-2260, so that traffic control personnel can be present. Mike Stoddart at (208) 201-3323 is also a contact for wide loads.
Last updated on September 4
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 30
Map of Reports on US 30 Between Banks Valley Road and Pegram Road (6 to 11 miles east of the Montpelier area). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Expect delays. Look out for flaggers. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Truck restrictions are in force. If weather permits. Speed limit 55 MPH. Width limit 12'0". Expect 15 - minute delays. Until September 30.
US 30 in both directions: Roadway reduced to one lane, bridge maintenance operations, truck restrictions in force, width limit in effect.
US 30 in both directions: Height limit in effect.
US 30 in both directions: Roadway reduced to one lane, road construction, paving operations, delays, look out for flaggers, consider using an alternate route, speed restrictions in force, width limit in effect, truck restrictions in force, if weather permits.
US 30: Fish Creek
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup