Truck Restrictions on I-84
I-84
Between The Oregon State Line (near Fruitland) and Exit 17: Sand Hollow (12 miles west of the Caldwell exit). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 14'0". Until October 31.

Comment: The normal operating hours for this project will be Monday through Friday, 6 AM to 8 PM from June 16th until October 31, 2014. Traffic will be placed into a two-way, opposing single lane configuration. Crossovers will be located at MP0.25, either side of IC 03, and west of IC 13. The Westbound on and off ramps at Exit 09, (US30) will be closed until early September. Motorists are advised to use alternate routes at Exit 03 or at Exit 13. Motorists are advised to use Exit 3, US95 and proceed north to US30. A signed detour will be posted to direct traffic to east to exit 13, where they will be directed over to the westbound direction.
Last updated on September 16
Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. People are working in the median. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. A detour is in operation. Speed limit 55 MPH . Width limit 12'0". Until October 1, 2015.

Comment: I-84 Loads over 12’ wide (westbound) are being detoured between exits 57 and 59 via Federal Way. I-84 loads over 12’ wide (eastbound) are being detoured off and on at the Gowen Road IC Ramps. This restriction will be in place until late October 2014.
Last updated on September 15
Between Exit 137 and Exit 141: I-84B; US 26 (near Bliss). Bridge maintenance work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 13'0". Until September 26.

Comment: Bridge resurfacing project on Union Pacific Railroad overpass west of Exit 141. Watch for trucks entering and exiting work zone. Wide loads must use I-84 business loop between Exits 137 and 141 through Bliss. Contractor: L&J Construction, 406-599-7776
Last updated on August 25