Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Truck Restrictions on I-84
I-84
Between The Oregon State Line (near Fruitland) and Exit 17: Sand Hollow (12 miles west of the Caldwell exit). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 14'0". Until October 31.

Comment: The normal operating hours for this project will be Monday through Friday, 6 AM to 8 PM from June 16th until October 31, 2014. Traffic will be placed into a two-way, opposing single lane configuration. Crossovers will be located at MP0.25, either side of IC 03, and west of IC 13. The Westbound on and off ramps at Interchange 09, (US30) will be closed until early September. Motorists are advised to use alternate routes at IC 03 or at IC 13. Motorists are advised to use Exit 3, US95 and proceed north to US30. A signed detour will be posted to direct traffic to east to IC 13, where they will be directed over to the westbound direction.
Last updated yesterday at 10:33am MDT
Between Exit 29: US 20; Franklin Road and Exit 38: I-84B (near Nampa). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. A detour is in operation. Speed restrictions are in force. Speed limit 55 MPH . Width limit 10'0". Until October 3.

Comment: **West-Bound Detour: Starting at 12:01 AM on Monday (6/23) morning and continuing for several weeks (currently scheduled for July 14, 2014), wide loads over 10 feet will be required to exit at Exit 36 (Franklin 1C). The detour for oversize loads will be routed north to Karcher Rd. between Exit 36 and Exit 33 (Hwy 55). ***Truck Height, Length and Axie Limits posted above with (***)
Last updated today at 8:28am MDT
Between Exit 29: US 20; Franklin Road and Exit 38: I-84B (near Nampa). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. A detour is in operation. Speed limit 55 MPH . Width limit 18'0". Until October 3.

Comment: * Traffic will be open in two lanes between 5:00 AM and 9:00 PM in both directions. Traffic may be reduced to one lane between 9:00 PM and 5:00 AM. **East-Bound Detour wide loads over 18 feet will be required to exit at Exit 33 (Hwy 55). The detour for oversize loads will be routed north to Karcher Rd. between Exit 36 and Exit 33 (Hwy) 55
Last updated today at 8:27am MDT
Between Exit 52: Orchard Street and Exit 57: Gowen Road (near Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. There is work on the shoulder. People are working in the median. Speed restrictions are in force. Speed limit 55 MPH . Width limit 14'0". From 8:00PM MDT to 5:00AM MDT daily. Until December 1, 2015.

Comment: 14’ width restriction on Broadway WB onramp. Mainline lanes have no width restriction. Please call Dana at 830-3617 regarding wider loads.
Last updated today at 8:25am MDT
Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). Road closed to traffic. Detour in operation. Starting 7:00PM MDT, 7/24/2014 until today at about 11:00PM MDT.

Comment: I-84 traffic will be detoured in east Boise in the evenings tonight through Thursday (July 21 - 24) as blasting continues at the Gowen Interchange. All traffic will be detoured off I-84 at the Broadway and Eisenman interchanges and onto Federal Way.

More Info: blasting detour
Last updated yesterday at 10:55am MDT
At ID 21 (Boise). The road is closed intermittently. Truck restrictions are in force. The roadway is reduced to one lane. Night time construction work is in progress. Follow the detour signs. Speed limit 55 MPH . Width limit 12'0". From 7:00PM MDT to 10:00PM MDT daily. Until September 1.

Comment: I-84 Loads over 12’ wide are being detoured between exits 57 and 59 via Federal Way and Eisenman Roads. This restriction will be in place until late October 2014. Rock blasting will be happening between the hours of 7pm to dusk on various nights for the next 3 months. Detour will be in place when blasting near I-84. Eastbound off and on-ramps, and Gowen Road between I-84 and Eisenman Road will be intermittently closed the nights for blasting. Eastbound ramp traffic will be detoured to the Eisenman Interchange (exit 60).
Last updated on July 10
At Exit 125: 18th East Street (3 miles east of the Glenns Ferry area). Bridge maintenance work is in progress. Traffic restrictions are in force. On. Overpass. The roadway is reduced to one lane. There is a width limit in effect. Width limit 13'0". Until August 29.

Comment: Bridge resurfacing project affecting local roadway at Paradise Valley/Exit 125. No restrictions on Interstate 84. Contractor: L&J Construction, 406-599-7776
Last updated on July 22
Between Exit 137 and Exit 141: I-84B; US 26 (near Bliss). Bridge maintenance work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 13'0". Until August 29.

Comment: Bridge resurfacing project on Union Pacific Railroad overpass west of Exit 141. Watch for trucks entering and exiting work zone. Wide loads must use I-84 business loop between Exits 137 and 141 through Bliss. Contractor: L&J Construction, 406-599-7776
Last updated on July 22