Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Truck Restrictions on US 26
US 26
At ID 46 (near Gooding). Look out for construction work. The road is being repaved. There are alternating lane closures. Look out for flaggers. Expect delays. There is a width limit in effect. Consider using an alternate route. Expect 5 - minute delays.. Width limit 14'0". From 7:00AM MDT to 6:00PM MDT on weekdays. Until August 8.

Comment: Construction of a traffic signal and stormwater system at the junction of US 26 and Idaho 46 in Gooding. Contractor: Western Construction -208-345-1440
Last updated yesterday at 8:00am MDT
At South Boulevard (Idaho Falls). There is a height limit in effect. Height limit 14'0".

Comment: There is a permanent height restriction of 14 feet on the eastbound underpass south of G Street in Idaho Falls. The underpass runs beneath the transportation department's South Boulevard Bridge and Union Pacific's Railroad Bridge, which lie side by side over U.S. 26 (Yellowstone Highway) at milepost 333.51.
Last updated on July 18
At South Boulevard (Idaho Falls). There is a height limit in effect. Height limit 13'8".

Comment: There is a permanent height restriction of 13 feet 8 inches on the westbound underpass south of G Street in Idaho Falls. The underpass runs beneath the transportation department's South Boulevard Bridge and Union Pacific's Railroad Bridge, which lie side by side over U.S. 26 (Yellowstone Highway) at milepost 333.51.
Last updated on July 18