Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 95
US 95: Road construction.
Between Exit 312 and Leon Road (6 miles north of the Lewiston area). Road construction work is in progress. Speed limit 45 MPH . Width limit 12'0". Until September 8.

Comment: Beginning June 12th a speed limit of 45 mph is in effect until July 31st. Road construction work is in progress on US-95 Lewiston Interchange Ramps from Milepost 312.52, to North of WA 195 Intersection to Milepost 319.52 beginning May 18th until September 8, 2015. There are four 12 foot lanes open from Milepost 312.52 to Milepost 317 for the majority of the work while guardrail work and signs are being completed. One lane will be closed between Milepost 317.27 and Milepost 319.86. There will be a detour in place July 30th and the detour will be intermitten until August 15th. The NB detour begins at Milepost 318.9 and the SB detour begins at the junction of US-195 and old highway 95. There is a speed advisory of 45 mph Monday through Sunday 24 Hours, 7 days a week. Traffic Control is Traffic Corp, Dan Edwards.
Last updated today at 2:09pm PDT
US 95: Road construction, paving operations, work on the shoulder, look out for flaggers, consider using an alternate route, speed restrictions in force, width limit in effect.
Between Conkling Road (near Worley) and ID 58 (1 mile north of the Worley area). Road construction work is in progress. The road is being repaved. There is work on the shoulder. Look out for flaggers. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Speed limit 35 MPH . Width limit 12'0". Until October 31.

Comment: US 95, between Conkling Road and ID 58 (1 mile north of the Worley area). Road construction work is in progress. Expect delays. Look out for flaggers. Reduce your speed. There is a width limit in effect. There is work on the shoulder. Truck speed limit 35 MPH. Expect 15-minute delays. Width limit 12'0". Unitl October 31. The Project Superintendent is M.A. DeAtley, Bill Brown, (509) 254-1341. Traffic control is Traffic Management Inc., Jesse Wood, (208) 660-3743.
Last updated today at 7:31am PDT
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 95
Map of Reports on US 95 Between I-84 (1 mile west of the Fruitland area) and US 30; 16th Street North (Fruitland). Road construction work is in progress. Look out for flaggers. Short delays are possible. Until August 6. Between Exit 312 and Leon Road (6 miles north of the Lewiston area). Road construction work is in progress. Speed limit 45 MPH. Width limit 12'0". Until September 8. Between Scoville Road (16 miles north of the Moscow area) and Browns Lane (14 miles south of the Tensed area). Road construction work is in progress. The road is being repaved. There is work on the shoulder. Expect delays. Look out for flaggers. Expect 15 - minute delays. From 7:00AM PDT to 5:30PM PDT on weekdays. Until September 4. Between Conkling Road (near Worley) and ID 58 (1 mile north of the Worley area). Road construction work is in progress. The road is being repaved. There is work on the shoulder. Look out for flaggers. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Speed limit 35 MPH. Width limit 12'0". Until October 31.
US 95: Road construction.
US 95: Road construction, paving operations, work on the shoulder, look out for flaggers, consider using an alternate route, speed restrictions in force, width limit in effect.
US 95: Lewiston Hill
US 95: Whitebird Hill
Bonners Ferry Weigh Station
Lewiston Weigh Station
Marsing Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations