Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 39
ID 39 in both directions: Road construction, paving operations, work on the shoulder, look out for flaggers, width limit in effect.
Between Center Street and Trego Road (1 to 2 miles west of the Blackfoot area). Road construction work is in progress. The road is being repaved. There is work on the shoulder. Look out for flaggers. There is a width limit in effect. Width limit 12'0". From 5:00AM MDT to 3:30PM MDT on Monday, Tuesday, Wednesday and Thursday. Until July 25, 2017 at about 5:30PM MDT.

Web Comment: Lane construction on Idaho State Highway 39, within the city limits of Riverside, between mileposts 49.497 and 50.810. Oversized loads exceeding 12' may be accommodated with 24 hours notice. Use caution around crews and equipment.
Last updated on May 17
Switch to Road Reports
Truck Restrictions on ID 39
Map of Reports on ID 39 Between Center Street and Trego Road (1 to 2 miles west of the Blackfoot area). Road construction work is in progress. The road is being repaved. There is work on the shoulder. Look out for flaggers. There is a width limit in effect. Width limit 12'0". From 5:00AM MDT to 3:30PM MDT on Monday, Tuesday, Wednesday and Thursday. Until July 25, 2017 at about 5:30PM MDT.
ID 39 in both directions: Road construction, paving operations, work on the shoulder, look out for flaggers, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations