I-86
I-86 in both directions: Roadway reduced to one lane, work on the shoulder, width limit in effect, night time construction work.
Between Exit 49: Rainbow Road (near Arbon Valley) and I-15 (Pocatello). The roadway is reduced to one lane. There is work on the shoulder. There is a width limit in effect. Night time construction work is in progress. Width limit 14'0". From 7:00PM MDT to 7:00AM MDT on Mondays, Tuesdays, Wednesdays and Thursdays. Until April 30.

Comment: This project will fill in rain washes under the guardrail between milepost 62.5, Flying Wye in Pocatello, and milepost 52, Arbon Valley Exit. Width restriction in effect during nighttime working hours. All lanes will be open during the day. Use caution around crews and equipment.
Last updated today at 5:23pm MDT
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-86
Map of Reports on I-86 Between Exit 49: Rainbow Road (near Arbon Valley) and I-15 (Pocatello). The roadway is reduced to one lane. There is work on the shoulder. There is a width limit in effect. Night time construction work is in progress. Width limit 14'0". From 7:00PM MDT to 7:00AM MDT on Mondays, Tuesdays, Wednesdays and Thursdays. Until April 30.
I-86 in both directions: Roadway reduced to one lane, work on the shoulder, width limit in effect, night time construction work.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup