Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 46
ID 46: Construction work, paving operations, roadway reduced to one lane, look out for flaggers, loose gravel, width limit in effect.
Between East 4600 North Road (3 miles north of the Buhl area) and East 3300 South Road (2 miles south of the Wendell area). Look out for construction work. The road is being repaved. The roadway is reduced to one lane. Look out for flaggers. Look out for loose gravel on the roadway. There is a width limit in effect. Expect 15 - minute delays. Width limit 12'0". From 8:00AM MDT to 6:00PM MDT on weekdays. Until July 15, 2017 at about 5:00PM MDT.

Web Comment: Roadway paving project between Snake River and 3400 South Road (milepost 90 to 96)
Last updated on April 20
Switch to Road Reports
Truck Restrictions on ID 46
Map of Reports on ID 46 Between East 4600 North Road (3 miles north of the Buhl area) and East 3300 South Road (2 miles south of the Wendell area). Look out for construction work. The road is being repaved. The roadway is reduced to one lane. Look out for flaggers. Look out for loose gravel on the roadway. There is a width limit in effect. Expect 15 - minute delays. Width limit 12'0". From 8:00AM MDT to 6:00PM MDT on weekdays. Until July 15, 2017 at about 5:00PM MDT.
ID 46: Construction work, paving operations, roadway reduced to one lane, look out for flaggers, loose gravel, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations