Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 3
ID 3: Road construction, roadway reduced to one lane, pilot car in operation, look out for flaggers, width limit in effect, delays.
Between First Avenue (Deary) and ID 8; The Junction of Highway 3 and Highway 8 in Bovill (Bovill). Road construction work is in progress. The roadway is reduced to one lane. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Expect delays. Width limit 12'0". Expect 15 - minute delays.. Until September 25.

Web Comment: Road construction will begin August 18th between the Junction of Highway 3 (Deary) and Highway 8 in Bovill. Traffic will be reduced to one lane in both directions with a pilot car. The Contractor is Poe Asphalt Paving, Inc. Jeremy Walkup and Traffic control is Eclipse Traffic Control, Ricki Lanham.
Last updated today at 8:08am PDT
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on ID 3
Map of Reports on ID 3 Between First Avenue (Deary) and ID 8; The Junction of Highway 3 and Highway 8 in Bovill (Bovill). Road construction work is in progress. The roadway is reduced to one lane. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Expect delays. Width limit 12'0". Expect 15 - minute delays. Until September 25.
ID 3: Road construction, roadway reduced to one lane, pilot car in operation, look out for flaggers, width limit in effect, delays.
ID 3: Kendrick
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations