Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 28
ID 28: Bridge construction, roadway reduced to one lane, temporary traffic lights, traffic held, speed restrictions in force, width limit in effect.

Between Lee Creek Road and Hayden Creek Lane (10 to 14 miles north of the Leadore area). Bridge construction work is in progress. The roadway is reduced to one lane. Look out for temporary traffic lights. Traffic is being held. Expect delays. Speed restrictions are in force. There is a width limit in effect. Width limit 11'0". Until October 26, 2018 at about 5:30PM MDT.

Web Comment: Wadsworth Brothers Construction is constructing 3 bridges accross the Lemhis River. For loads wider than 11'0" contact Bryan Young at 208-745-5682.

Last updated on April 24
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on ID 28
Map of Reports on ID 28 Between Lee Creek Road and Hayden Creek Lane (10 to 14 miles north of the Leadore area). Bridge construction work is in progress. The roadway is reduced to one lane. Look out for temporary traffic lights. Traffic is being held. Expect delays. Speed restrictions are in force. There is a width limit in effect. Width limit 11'0". Until October 26, 2018 at about 5:30PM MDT.
ID 28: Bridge construction, roadway reduced to one lane, temporary traffic lights, traffic held, speed restrictions in force, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations