Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 89
US 89 in both directions: Roadway reduced to one lane, paving operations, loose gravel, seal coat, consider using an alternate route, speed restrictions in force, width limit in effect.
Between Third Street and Center Lane - Bischoff Road (12 miles north of the Montpelier area). The roadway is reduced to one lane. The road is being repaved. Look out for loose gravel on the roadway. A seal coat treatment has been applied. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Speed limit 45 MPH . Width limit 14'0". From 8:00AM MDT to 8:00PM MDT on weekdays and Saturdays. Until Saturday, at about 8:00PM MDT.

Web Comment: This paving project is on US-89, between milepost 26.435, 3rd Street in Montpelier, and milepost 40.211, intersection of US-89 and Idaho State Highway 61. Use caution around crews and equipment.
Last updated on July 19
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 89
Map of Reports on US 89 Between Third Street and Center Lane - Bischoff Road (12 miles north of the Montpelier area). The roadway is reduced to one lane. The road is being repaved. Look out for loose gravel on the roadway. A seal coat treatment has been applied. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Speed limit 45 MPH. Width limit 14'0". From 8:00AM MDT to 8:00PM MDT on weekdays and Saturdays. Until Saturday, at about 8:00PM MDT.
US 89 in both directions: Roadway reduced to one lane, paving operations, loose gravel, seal coat, consider using an alternate route, speed restrictions in force, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations