Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 20
US 20 in both directions: Road construction, lane closed, observe signals, width limit in effect, speed restrictions in force.
Between 2200 North Road and US 93 (near Arco). Road construction work is in progress. A lane is closed. Observe the signals. There is a width limit in effect. Speed restrictions are in force. Expect 5 - minute delays.. Width limit 13'0". Until Monday, at about 7:00PM MDT.

Comment: For loads over 13 ft wide, call with description for possible accomodation. Assistance through the project avaiable 7 am to 7 pm Mon-Thur.Construction crew is resurfacing the Bridge deck. Watch for construction workers.Signal lights are in place 24 hrs a day 7 days a week. the speed is reduced to 25 Miles Per Hour
Last updated on May 6
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 20
Map of Reports on US 20 Between Bellin Road and I-15; US 91 (Idaho Falls). Utility work is in progress. Until today at about 6:00PM MDT. Between 1425 North Road and Wood Road (7 miles east of the Ashton area). Look out for large animals on the roadway. There is danger of a rock fall.
US 20 in both directions: Road construction, lane closed, observe signals, width limit in effect, speed restrictions in force.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations