Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-84
I-84: Road construction, work on the shoulder, roadway reduced to one lane, speed restrictions in force, width limit in effect.
Between The Oregon State Line (near Fruitland) and Exit 17: Sand Hollow (12 miles west of the Caldwell exit). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 14'0". Until October 31.

Comment: The normal operating hours for this project will be Monday through Friday, 6 AM to 8 PM from June 16th until October 31, 2014. Traffic will be placed into a two-way, opposing single lane configuration. Crossovers will be located at MP0.25, either side of IC 03, and west of IC 13. The Westbound on and off ramps at Interchange 09, (US30) will be closed until early September. Motorists are advised to use alternate routes at IC 03 or at IC 13. Motorists are advised to use Exit 3, US95 and proceed north to US30. A signed detour will be posted to direct traffic to east to IC 13, where they will be directed over to the westbound direction.
Last updated on July 23
I-84 westbound: Road construction, bridge construction, roadway reduced to one lane, width limit in effect, detour in operation, speed restrictions in force.
Between Exit 29: US 20; Franklin Road and Exit 38: I-84B (near Nampa). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. A detour is in operation. Speed restrictions are in force. Speed limit 55 MPH . Width limit 10'0". Until October 3.

Comment: **West-Bound Detour: Starting at 12:01 AM on Monday (6/23) morning and continuing for several weeks (currently scheduled for July 14, 2014), wide loads over 10 feet will be required to exit at Exit 36 (Franklin 1C). The detour for oversize loads will be routed north to Karcher Rd. between Exit 36 and Exit 33 (Hwy 55). ***Truck Height, Length and Axie Limits posted above with (***)
Last updated on July 24
I-84 eastbound: Road construction, bridge construction, roadway reduced to one lane, speed restrictions in force, width limit in effect, detour in operation.
Between Exit 29: US 20; Franklin Road and Exit 38: I-84B (near Nampa). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. A detour is in operation. Speed limit 55 MPH . Width limit 18'0". Until October 3.

Comment: * Traffic will be open in two lanes between 5:00 AM and 9:00 PM in both directions. Traffic may be reduced to one lane between 9:00 PM and 5:00 AM. **East-Bound Detour wide loads over 18 feet will be required to exit at Exit 33 (Hwy 55). The detour for oversize loads will be routed north to Karcher Rd. between Exit 36 and Exit 33 (Hwy) 55
Last updated on July 24
I-84: Road construction, bridge construction, roadway reduced to one lane, width limit in effect, work on the shoulder, work in the median, speed restrictions in force.
Between Exit 52: Orchard Street and Exit 57: Gowen Road (near Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. There is work on the shoulder. People are working in the median. Speed restrictions are in force. Speed limit 55 MPH . Width limit 14'0". From 8:00PM MDT to 5:00AM MDT daily. Until December 1, 2015.

Comment: 14’ width restriction on Broadway WB onramp. Mainline lanes have no width restriction. Please call Dana at 830-3617 regarding wider loads.
Last updated on July 24
I-84: Road closed to traffic, detour in operation.
Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). The road is closed to traffic. A detour is in operation. From 7:00PM MDT to 11:00PM MDT on Monday, Tuesday, Wednesday and Thursday. Until Thursday, at about 11:00PM MDT.

Comment: I-84 traffic will be detoured in east Boise in the evenings tonight through Thursday (July 28 - 31) as blasting continues at the Gowen Interchange. All traffic will be detoured off I-84 at the Broadway and Eisenman interchanges and onto Federal Way.

More Info: gowen blasting
Last updated yesterday at 10:38am MDT
I-84 in both directions: Road closed intermittently, truck restrictions in force, roadway reduced to one lane, night time construction work, follow the detour signs.
At ID 21 (Boise). The road is closed intermittently. Truck restrictions are in force. The roadway is reduced to one lane. Night time construction work is in progress. Follow the detour signs. Speed limit 55 MPH . Width limit 12'0". From 7:00PM MDT to 10:00PM MDT daily. Until September 1.

Comment: I-84 Loads over 12’ wide are being detoured between exits 57 and 59 via Federal Way and Eisenman Roads. This restriction will be in place until late October 2014. Rock blasting will be happening between the hours of 7pm to dusk on various nights for the next 3 months. Detour will be in place when blasting near I-84. Eastbound off and on-ramps, and Gowen Road between I-84 and Eisenman Road will be intermittently closed the nights for blasting. Eastbound ramp traffic will be detoured to the Eisenman Interchange (exit 60).
Last updated on July 10
I-84: Bridge maintenance operations, traffic restrictions in force, on, overpass, roadway reduced to one lane, width limit in effect.
At Exit 125: 18th East Street (3 miles east of the Glenns Ferry area). Bridge maintenance work is in progress. Traffic restrictions are in force. On. Overpass. The roadway is reduced to one lane. There is a width limit in effect. Width limit 13'0". Until August 29.

Comment: Bridge resurfacing project affecting local roadway at Paradise Valley/Exit 125. No restrictions on Interstate 84. Contractor: L&J Construction, 406-599-7776
Last updated on July 22
I-84 in both directions: Bridge maintenance operations, roadway reduced to one lane, speed restrictions in force, width limit in effect.
Between Exit 137 and Exit 141: I-84B; US 26 (near Bliss). Bridge maintenance work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 13'0". Until August 29.

Comment: Bridge resurfacing project on Union Pacific Railroad overpass west of Exit 141. Watch for trucks entering and exiting work zone. Wide loads must use I-84 business loop between Exits 137 and 141 through Bliss. Contractor: L&J Construction, 406-599-7776
Last updated on July 22
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-84
Map of Reports on I-84 Between The Oregon State Line (near Fruitland) and Exit 17: Sand Hollow (12 miles west of the Caldwell exit). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 14'0". Until October 31. Between Exit 29: US 20; Franklin Road and Exit 38: I-84B (near Nampa). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. A detour is in operation. Speed restrictions are in force. Speed limit 55 MPH. Width limit 10'0". Until October 3. Between Exit 29: US 20; Franklin Road and Exit 38: I-84B (near Nampa). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. A detour is in operation. Speed limit 55 MPH. Width limit 18'0". Until October 3. Between Exit 38: I-84B (Meridian) and I-184 (Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to two lanes. The left lane is closed. Speed restrictions are in force. Speed limit 55 MPH. Until October 31, 2015. Between ID 55 and Exit 50: Overland Road (near Boise). Traffic is stop and go. Between Exit 52: Orchard Street and Exit 57: Gowen Road (near Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. There is work on the shoulder. People are working in the median. Speed restrictions are in force. Speed limit 55 MPH. Width limit 14'0". From 8:00PM MDT to 5:00AM MDT daily. Until December 1, 2015. Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). The road is closed to traffic. A detour is in operation. From 7:00PM MDT to 11:00PM MDT on Monday, Tuesday, Wednesday and Thursday. Until Thursday, at about 11:00PM MDT. Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. People are working in the median. The roadway is reduced to one lane. Speed restrictions are in force. Speed limit 55 MPH. Until October 1, 2015. Between The Boise Port of Entry and Exit 74: Simco Road (8 to 12 miles east of the Boise area). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. Speed restrictions are in force. Speed limit 65 MPH. Until August 15. Between Exit 137 and Exit 141: I-84B; US 26 (near Bliss). Bridge maintenance work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 13'0". Until August 29.
I-84: Road construction, work on the shoulder, roadway reduced to one lane, speed restrictions in force, width limit in effect.
I-84 westbound: Road construction, bridge construction, roadway reduced to one lane, width limit in effect, detour in operation, speed restrictions in force.
I-84 eastbound: Road construction, bridge construction, roadway reduced to one lane, speed restrictions in force, width limit in effect, detour in operation.
I-84: Road construction, bridge construction, roadway reduced to one lane, width limit in effect, work on the shoulder, work in the median, speed restrictions in force.
I-84: Road closed to traffic, detour in operation.
I-84 in both directions: Road closed intermittently, truck restrictions in force, roadway reduced to one lane, night time construction work, follow the detour signs.
I-84: Bridge maintenance operations, traffic restrictions in force, on, overpass, roadway reduced to one lane, width limit in effect.
I-84 in both directions: Bridge maintenance operations, roadway reduced to one lane, speed restrictions in force, width limit in effect.
East Boise Weigh Station
Cotterell Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations