Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-84
I-84: Road maintenance operations, alternating lane closures, speed restrictions in force, width limit in effect.
Between Exit 120: Bannock Avenue and Eastbound Bliss Rest Area (7 miles east of the Glenns Ferry area). Road maintenance work is in progress. There are alternating lane closures. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH . Width limit 12'0". Until September 29, 2017 at about 5:00PM MDT.

Web Comment: Concrete pavement smoothness grinding, patching and repair between Glenns Ferry and King Hill areas (milepost 120-130). Starting June 6, the width limit will be 12 feet and will continue for 4 weeks. Contractor: Acme Concrete Paving, 509-242-1234
Last updated on August 11
I-84 in both directions: Left lane closed, because of bridge maintenance work, paving operations, width limit in effect.
Between Exit 141: I-84B and Exit 147: 2350 South Road (4 to 5 miles east of the Bliss area). The left lane is closed because of bridge maintenance work. The road is being repaved. There is a width limit in effect. Width limit 14'0". Until September 15, 2017 at about 5:00PM MDT.

Web Comment: Road surface work at Malad River bridges (milepost 146).
Last updated on August 18
I-84: Paving operations, roadway reduced to two lanes, speed restrictions in force, width limit in effect, exit ramp closed, entrance ramp closed.
Between Exit 157: ID 46 (near Wendell) and Exit 168: Jerome/Lincoln Street (near Jerome). The road is being repaved. The roadway is reduced to two lanes. Speed restrictions are in force. There is a width limit in effect. The exit ramp is closed. The entrance ramp is closed. Speed limit 70 MPH . Width limit 14'0". Until October 20, 2017 at about 5:00PM MDT.

Web Comment: Paving and bridge work on I-84 between Wendell and Jerome (milepost 157 to 167). Ramp closures at Exit 165, use Exit 168 to access Jerome.
Last updated on August 7
I-84 in both directions: Road construction, roadway reduced to two lanes, paving operations, work on the shoulder, speed restrictions in force, width limit in effect.
Between Exit 173: US 93 (9 miles west of the Hazelton area) and Exit 201: ID 25; Kasota Road (4 miles east of the Hazelton area). Road construction work is in progress. The roadway is reduced to two lanes. The road is being repaved. There is work on the shoulder. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH . Width limit 12'0". Until November 17, 2017 at about 8:00PM MDT.

Web Comment: I-84 reconstruction and bridge rehabilitation work of eastbound lanes. All traffic in westbound lanes between milepost 181 to 194. Contractor: Knife River Inc., 208-362-6152
Last updated on August 3
I-84: Roadway reduced to two lanes, because the road is being repaved, work in the median, speed restrictions in force, width limit in effect, ramp restrictions in force.
Between Exit 194: ID 25; Ridgeway Road (4 miles east of the Hazelton area) and Exit 208: ID 27 (6 miles west of the Burley area). The roadway is reduced to two lanes because the road is being repaved. People are working in the median. Speed restrictions are in force. There is a width limit in effect. Ramp restrictions are in force. Speed limit 65 MPH . Width limit 12'0". Until September 1, 2017 at about 6:00PM MDT.

Web Comment: Repaving westbound lanes of I-84, all traffic shifted to eastbound lanes. Use caution in median cross-overs. Ramp closures at Exit 201 are possible. Contractor: Idaho Materials and Construction - 208-733-5933
Last updated on August 9
I-84 in both directions: Bridge construction, roadway reduced to two lanes, width limit in effect, speed restrictions in force.
Between Exit 211: US 30; ID 24 and Exit 216: ID 25; ID 77 (5 miles east of the Heyburn area). Bridge construction work is in progress. The roadway is reduced to two lanes. There is a width limit in effect. Speed restrictions are in force. Speed limit 65 MPH . Width limit 15'0". Until October 27, 2017 at about 5:00PM MDT.

Web Comment: Bridge construction over Snake River at milepost 216. Use caution at on and off ramps at Declo Interchange (Exit 216).
Last updated on August 3
Switch to Road Reports
Truck Restrictions on I-84
Map of Reports on I-84 Between The Oregon State Line (near Fruitland) and Exit 114: I-84B (5 miles west of the Glenns Ferry area). Look out for traffic congestion becaause of a solar eclipse. Expect delays of uncertain duration. Until Tuesday, at about 5:00PM MDT. Between Exit 46: ID 55; Eagle Road and Exit 52: Orchard Street (near Boise). Road construction work is in progress. The roadway is reduced to two lanes. Speed restrictions are in force. Speed limit 55 MPH. From 10:00PM MDT to 7:00AM MDT on weekdays and Saturday. Until October 27, 2017 at about 5:00AM MDT. Between Exit 74: Simco Road and Exit 95: US 20; ID 51 (2 to 3 miles west of the Mountain Home area). Road construction work is in progress. The right lane is closed. Speed restrictions are in force. Speed limit 65 MPH. Until September 15, 2017 at about 6:00PM MDT. Between Exit 120: Bannock Avenue and Eastbound Bliss Rest Area (7 miles east of the Glenns Ferry area). Road maintenance work is in progress. There are alternating lane closures. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until September 29, 2017 at about 5:00PM MDT. Between Exit 137: I-84B and Exit 147: 2350 South Road (near Bliss). There is work on the shoulder. Look out for construction work. Until September 1, 2017 at about 5:00PM MDT. Between Exit 141: I-84B and Exit 147: 2350 South Road (4 to 5 miles east of the Bliss area). The left lane is closed because of bridge maintenance work. The road is being repaved. There is a width limit in effect. Width limit 14'0". Until September 15, 2017 at about 5:00PM MDT. Between Exit 157: ID 46 (near Wendell) and Exit 168: Jerome/Lincoln Street (near Jerome). The road is being repaved. The roadway is reduced to two lanes. Speed restrictions are in force. There is a width limit in effect. The exit ramp is closed. The entrance ramp is closed. Speed limit 70 MPH. Width limit 14'0". Until October 20, 2017 at about 5:00PM MDT. Between Exit 173: US 93 (9 miles west of the Hazelton area) and Exit 201: ID 25; Kasota Road (4 miles east of the Hazelton area). Road construction work is in progress. The roadway is reduced to two lanes. The road is being repaved. There is work on the shoulder. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until November 17, 2017 at about 8:00PM MDT. Between Exit 194: ID 25; Ridgeway Road (4 miles east of the Hazelton area) and Exit 208: ID 27 (6 miles west of the Burley area). The roadway is reduced to two lanes because the road is being repaved. People are working in the median. Speed restrictions are in force. There is a width limit in effect. Ramp restrictions are in force. Speed limit 65 MPH. Width limit 12'0". Until September 1, 2017 at about 6:00PM MDT.
I-84: Road maintenance operations, alternating lane closures, speed restrictions in force, width limit in effect.
I-84 in both directions: Left lane closed, because of bridge maintenance work, paving operations, width limit in effect.
I-84: Paving operations, roadway reduced to two lanes, speed restrictions in force, width limit in effect, exit ramp closed, entrance ramp closed.
I-84 in both directions: Road construction, roadway reduced to two lanes, paving operations, work on the shoulder, speed restrictions in force, width limit in effect.
I-84: Roadway reduced to two lanes, because the road is being repaved, work in the median, speed restrictions in force, width limit in effect, ramp restrictions in force.
I-84 in both directions: Bridge construction, roadway reduced to two lanes, width limit in effect, speed restrictions in force.
East Boise Weigh Station
Cotterell Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations