Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-15
I-15 in both directions: Roadway reduced to one lane, road construction, paving operations, bridge maintenance operations, work on the shoulder, work in the median, delays, look out for flaggers, speed restrictions in force, width limit in effect.

Between Exit 36: US 91; Hawkins Road (3 miles south of the Arimo area) and Exit 57: Interstate 15 Business (near Inkom). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Bridge maintenance work is in progress. There is work on the shoulder. People are working in the median. Expect delays. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 12'5". Until October 15, 2018 at about 6:00PM MDT.

Web Comment: Four bridges to undergo maintenance on I-15, between milepost 35.91, south of Virginia Interchange, and milepost 55.9, South of Inkom. Bridges include: Portneuf River Bridge at milepost 55.61, McCammon Interchange at milepost 47.16, Jensen Road Interchange at milepost 44.08, and Virginia Interchange at milepost 35.91. Expect crossovers at mileposts 55.2, 56.4, and 58.3. Use caution around crews and equipment.Four bridges to undergo maintenance on I-15, between milepost 35.91, south of Virginia Interchange, and milepost 55.90, South of Inkom. The Portneuf River Bridge at milepost 55.61, McCammon Interchange at milepost 47.16, Jensen Road Interchange at milepost 44.08, and Virginia Interchange at milepost 35.91. Three crossovers will be built at mileposts 55.2, 56.4, and 58.3. Single lane traffic in both directions during crossover construction. Use caution around crews and equipment.

Last updated on May 17
I-15 in both directions: Roadway reduced to one lane, bridge construction, delays of uncertain duration, speed restrictions in force, width limit in effect.

Between US 30 and The Inkom Port of Entry (near Inkom). The roadway is reduced to one lane. Bridge construction work is in progress. Expect delays of uncertain duration. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 12'6". Until Friday, at about 5:00PM MDT.

Web Comment: I-15 Bridges at Inkom undergoing maintenance. Interstate traffic reduced to one lane in each direction between milepost 56 and milepost 59 during construction. Use caution in presence of workers and equipment

Last updated on May 17
I-15: Paving operations, roadway reduced to two lanes, left lane closed, road construction.

Between Exit 80: Fort Hall (2 miles north of the Fort Hall area) and Exit 93: US 26 (1 mile south of the Blackfoot area). The road is being repaved. The roadway is reduced to two lanes. The left lane is closed. Road construction work is in progress. Speed limit 65 MPH. Width limit 15'0". Until July 4, 2018 at about 11:59PM MDT.

Last updated today at 4:56pm MDT
I-15: Construction work.

Between Exit 172: Sheep Station Road and Exit 180: Spenser Road (3 miles south of the Spencer area). Look out for construction work. Speed limit 65 MPH. Width limit 12'0". Until November 16, 2018 at about 11:59PM MDT.

Web Comment: Wide Loads are restricted to 12' all wide loads must call Troy Monk at 208-243-2683 for assistance.

Last updated on May 7
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-15
Map of Reports on I-15 Between The Utah State Line (12 miles south of the Malad City area) and Exit 31: ID 40; Downey Road (11 miles south of the Arimo area). Look out for mobile maintenance operations. From 6:00AM MDT to 5:00PM MDT on Monday, Tuesday, Wednesday and Thursday. Until May 31, 2018 at about 5:00PM MDT. Between Exit 36: US 91; Hawkins Road (3 miles south of the Arimo area) and Exit 57: Interstate 15 Business (near Inkom). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Bridge maintenance work is in progress. There is work on the shoulder. People are working in the median. Expect delays. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 12'5". Until October 15, 2018 at about 6:00PM MDT. Between US 30 and The Inkom Port of Entry (near Inkom). The roadway is reduced to one lane. Bridge construction work is in progress. Expect delays of uncertain duration. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 12'6". Until Friday, at about 5:00PM MDT. Between Exit 80: Fort Hall (2 miles north of the Fort Hall area) and Exit 93: US 26 (1 mile south of the Blackfoot area). The road is being repaved. The roadway is reduced to two lanes. The left lane is closed. Road construction work is in progress. Speed limit 65 MPH. Width limit 15'0". Until July 4, 2018 at about 11:59PM MDT. Between Exit 180: Spenser Road and Exit 190: Humphrey Road (2 miles north of the Spencer area). Watch for deer on the roadway. Drive with extreme caution.
I-15 in both directions: Roadway reduced to one lane, road construction, paving operations, bridge maintenance operations, work on the shoulder, work in the median, delays, look out for flaggers, speed restrictions in force, width limit in effect.
I-15 in both directions: Roadway reduced to one lane, bridge construction, delays of uncertain duration, speed restrictions in force, width limit in effect.
I-15: Paving operations, roadway reduced to two lanes, left lane closed, road construction.
I-15: Construction work.
Inkom Weigh Station
Sage Junction Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations