Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 51
ID 51: Bridge construction, roadway reduced to one lane, speed restrictions in force, width limit in effect.
Between Hot Springs Road and Goldsmith Road (11 to 13 miles south of the Mountain Home area). Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Width limit 11'0". Speed limit 50 MPH . Until December 1, 2017 at about 11:45PM MDT.

Web Comment: Contractor will be replacing the Snake River Bridge by demolishing and constructing the bridge one half at a time. Temporary Traffic Signals will be used to direct traffic in alternating directions across the one lane bridge
Last updated on September 12
Switch to Road Reports
Truck Restrictions on ID 51
Map of Reports on ID 51 Between Hot Springs Road and Goldsmith Road (11 to 13 miles south of the Mountain Home area). Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Width limit 11'0". Speed limit 50 MPH. Until December 1, 2017 at about 11:45PM MDT.
ID 51: Bridge construction, roadway reduced to one lane, speed restrictions in force, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations