Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 75: Road construction, paving operations, trucks are entering the roadway, delays, look out for flaggers, width limit in effect, drive carefully. ID 75: Road construction.
Between Seventh Street and Mammoth Cave Road (7 miles north of the Shoshone area). Road construction work is in progress. The road is being repaved. Look out for trucks entering the roadway. Expect delays. Look out for flaggers. There is a width limit in effect. Drive carefully. Expect 15 - minute delays.. Width limit 13'0". Until June 28.

Comment: Delays possible due to road building along Idaho 75 between Shoshone and Mammoth Cave (milepost 74 to 82). Watch for road paving activities and equipment in area. Contractor: Idaho Sand and Gravel, 208-324-0511 Traffic Control: Specialty Const. Supply, 888-574-7732
Last updated today at 8:38am MDT
ID 75: Road construction.
Map of ID 75: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup Truck Ramp Truck Ramp