Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-84: Road construction, roadway reduced to one lane, speed restrictions in force, width limit in effect.
I-84: Road construction.
Between The Oregon State Line (near Fruitland) and Exit 17: Sand Hollow (12 miles west of the Caldwell exit). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 14'0". Until November 15.

Comment: Beginning on 10/06/2014, re-paving will be starting on the on & off ramps at east bound exit 3. This work will be controlled by flaggers. EXPECT DELAYS. I-84 Eastbound traffic will be reduced to one lane at the Snake River Bridge and will be switched over to the Westbound lanes after the bridge. I-84 Westbound will be reduced to one lane at approximately MP 13.4. Traffic will be in a two-lane/two-way configuration from the Snake River Bridge to MP 13. The Eastbound Off and On Ramps at IC9 will be closed on September 2nd. Signed detours will be in place.
Last updated today at 9:21am MDT
I-84: Road construction.
Map of I-84: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations