Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Reports on US 95
Map of Reports on US 95 Between East McConnell Avenue (near Parma) and US 30 (1 mile south of the Fruitland area). Look out for a slow moving maintenance vehicle. From 5:00AM MDT to 3:00PM MDT on Tuesday, Wednesday and Thursday. Until Thursday, at about 3:00PM MDT. Between Middle Fork Road (2 miles south of the Council area) and Colt Street (New Meadows). Road construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Expect delays. A pilot car is in operation. Expect 15 - minute delays. From 7:00AM MDT to 6:00PM MDT daily. Until September 30. Between County Road (14 miles north of the New Meadows area) and Pinehurst Road (11 miles south of the Riggins area). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Look out for flaggers. Expect delays. There is a width limit in effect. Speed restrictions are in force. Width limit 14'0". Expect 5 - minute delays. Speed limit 35 MPH. From 7:00AM MDT to 7:00PM MDT on weekdays. Until August 13. Between White Bird Creek Bridge (5 miles north of the White Bird area) and Lake Road (5 miles south of the Grangeville area). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Look out for flaggers. Expect 15 - minute delays. Until September 5. Between Cummins Road and Fernand South Road (near Ferdinand). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Look out for loose gravel on the roadway. Look out for flaggers. Expect 15 - minute delays. Until September 9. Between Hawley Road and Smith Road (2 to 3 miles north of the Moscow area). Road construction work is in progress. The road is being repaved. There is work on the shoulder. Short delays are possible. Look out for flaggers. Until September 22. Between Johnston Road and Seltice Avenue (near Plummer). Bridge construction work is in progress. Speed limit 20 MPH. Width limit 14'0". Until September 19. Between ID 53 (3 miles north of the Hayden area) and Parks Road (near Athol). Look out for construction work. Speed limit 35 MPH. Until Thursday, at about 6:00PM PDT. Between East Remington Road and Granite-Kelso Cut-Off Road (near Athol). Major road construction work is in progress. Look out for a new road construction layout. Short delays are possible due to stopped traffic. Look out for flaggers. Speed restrictions are in force. Truck speed limit 45 MPH. Between Grove Avenue and Granite-Kelso Cut-Off Road (1 mile north of the Athol area). The roadway is reduced to one lane because of major road construction work. Look out for trucks entering the roadway. Speed restrictions are in force. Speed limit 45 MPH. Between Washington Street - Madison Street and Comance Street (Bonners Ferry). Bridge maintenance work is in progress. Look out for flaggers. The roadway is reduced to two lanes. Speed limit 25 MPH. Width limit 10'0". Until September 2.
US 95: Slow moving maintenance vehicle.
US 95 northbound: Rest area closed.
US 95: Bridge construction, roadway reduced to one lane, look out for flaggers, short delays.
US 95: Road construction, roadway reduced to one lane, look out for flaggers, delays, pilot car in operation.
US 95: Road construction, work on the shoulder, roadway reduced to one lane, look out for flaggers, delays, width limit in effect, speed restrictions in force.
US 95 in both directions: Bridge construction, roadway reduced to one lane, temporary traffic lights, truck restrictions in force.
US 95 in both directions: Road construction, work on the shoulder, roadway reduced to one lane, look out for flaggers.
US 95: Road construction, work on the shoulder, roadway reduced to one lane, loose gravel, look out for flaggers.
US 95 in both directions: Road construction, paving operations, work on the shoulder, short delays, look out for flaggers.
US 95: Bridge construction.
US 95: Construction work.
US 95 in both directions: Roadway reduced to one lane, because of major road construction work, speed restrictions in force.
US 95 in both directions: Major road construction, new road construction layout, short delays, due to stopped traffic, look out for flaggers, speed restrictions in force.
US 95 in both directions: Roadway reduced to one lane, because of major road construction work, trucks are entering the roadway, speed restrictions in force.
US 95 in both directions: Bridge maintenance operations, look out for flaggers, roadway reduced to two lanes.
US 95 in both directions: Road maintenance operations, roadway reduced to one lane, traffic is being held. Expect delays, look out for flaggers.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info