Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Road Reports
US 95 Whole Road 6 reports
Oregon to Payette No reports
Payette to New Meadows 1 report
New Meadows to Lewiston 2 reports
Lewiston to Coeur d'Alene No reports
Coeur d'Alene to Canada 3 reports
Reports on US 95
Map of Reports on US 95 Between US Route 95 Business (3 miles south of the Culdesac area) and Winchester-Culdesac Road (near Culdesac). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. Look out for flaggers. Expect 15 - minute delays. From 6:30AM PDT to 5:30PM PDT on weekdays and Saturdays. Until June 7. Between Hatwai Bypass Road (1 mile south of the Lewiston area) and 48th Street North (near Lewiston). Road construction work is in progress. Northbound traffic. The left lane is closed. Width limit 17'0". For the next three weeks. Between ID 53 (3 miles north of the Hayden area) and East Remington Road (near Athol). Look out for construction work. Look out for flaggers. Speed limit 55 MPH.
US 95: Bridge construction, road construction, roadway reduced to one lane, delays, consider using an alternate route, speed restrictions in force, width limit in effect.
US 95: Road construction, bridge construction, work on the shoulder, look out for flaggers.
US 95 northbound: Road construction, northbound traffic, left lane closed.
US 95 in both directions: Construction work, look out for flaggers.
US 95: Bridge construction, look out for flaggers, width limit in effect.
US 95: Bridge maintenance operations.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info