Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Road Reports
US 95 Whole Road 8 reports
Oregon to Payette No reports
Payette to New Meadows 3 reports
New Meadows to Lewiston 3 reports
Lewiston to Coeur d'Alene No reports
Coeur d'Alene to Canada 2 reports
Reports on US 95
Map of Reports on US 95 Between Thomason Lane (9 miles north of the Cambridge area) and Colt Street (New Meadows). Road construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Expect delays. A pilot car is in operation. Expect 15 - minute delays. From 7:00AM MDT to 6:00PM MDT daily. Until today at about 6:00PM MDT. Between White Bird Creek Bridge (5 miles north of the White Bird area) and Lake Road (5 miles south of the Grangeville area). Road construction work is in progress. There is work on the shoulder. Until October 10. Between Cummins Road and Fernand South Road (near Ferdinand). Road construction work is in progress. There is work on the shoulder. Look out for loose gravel on the roadway. Until October 10. Between Parks Road and Granite-Kelso Cut-Off Road (1 mile north of the Athol area). Look out for construction work.
US 95: Road maintenance operations, roadway reduced to one lane, look out for flaggers, short delays.
US 95: Bridge construction, roadway reduced to one lane, look out for flaggers.
US 95: Road construction, roadway reduced to one lane, look out for flaggers, delays, pilot car in operation.
US 95 in both directions: Bridge construction.
US 95 in both directions: Road construction, work on the shoulder.
US 95: Road construction, work on the shoulder, loose gravel.
US 95: Construction work.
US 95 in both directions: Work on the shoulder, roadway reduced to one lane, right lane closed, look out for flaggers.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info