Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Reports on US 20: Parma to Boise
US 20: Parma to Boise
Between Jerico Road (near Eagle) and City Street (Boise). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. There is work on the shoulder. Look out for flaggers. From 10:00PM MDT to 5:00AM MDT daily. Until Tuesday, at about 5:00AM MDT.
Between I-184 and Fourth Street (near Boise). The roadway is reduced to three lanes. Until March 31, 2017.
Between Eighth Street and Fourth Street (near Boise). The roadway is reduced to three lanes. The left lane is closed. Until March 20, 2017.
At Exit 52: Federal Way (Boise). Bridge maintenance work is in progress. The roadway is reduced to one lane. There is work on the shoulder. The right lane is closed. Expect delays. Expect 15 - minute delays. From 10:00PM MDT to 5:00AM MDT daily. Until October 15.