Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 95: Payette to New Meadows
Between Copper Road and East Main Street (near Weiser). Bridge construction work is in progress. Road construction work is in progress. The roadway is reduced to one lane. Expect delays. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Width limit 13'6". Speed limit 35 MPH. Expect 15 - minute delays. From 7:00AM MDT to 7:00PM MDT on weekdays. Until December 31.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 95: Payette to New Meadows
Map of Reports on US 95 Between Copper Road and East Main Street (near Weiser). Bridge construction work is in progress. Road construction work is in progress. The roadway is reduced to one lane. Expect delays. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Width limit 13'6". Speed limit 35 MPH. Expect 15 - minute delays. From 7:00AM MDT to 7:00PM MDT on weekdays. Until December 31.
US 95: Bridge construction, road construction, roadway reduced to one lane, delays, consider using an alternate route, speed restrictions in force, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info