Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 93: Challis to Montana
US 93: Road construction, seal coat, loose gravel, pilot car in operation, look out for flaggers.
Between ID 75 (near Challis) and Pahsimeroi Road (15 miles north of the Challis area). Road construction work is in progress. A seal coat treatment has been applied. Look out for loose gravel on the roadway. A pilot car is in operation. Look out for flaggers. Until July 18.
US 93: Road maintenance operations.
Between Williams Creek Road (4 miles south of the Salmon area) and Bean Lane (Salmon). Road maintenance work is in progress. Until tomorrow at about 5:00PM MDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 93: Challis to Montana
Map of Reports on US 93 Between ID 75 (near Challis) and Pahsimeroi Road (15 miles north of the Challis area). Road construction work is in progress. A seal coat treatment has been applied. Look out for loose gravel on the roadway. A pilot car is in operation. Look out for flaggers. Until July 18. Between Williams Creek Road (4 miles south of the Salmon area) and Bean Lane (Salmon). Road maintenance work is in progress. Until tomorrow at about 5:00PM MDT.
US 93: Road construction, seal coat, loose gravel, pilot car in operation, look out for flaggers.
US 93: Road maintenance operations.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info