Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 20: Idaho Falls to Montana
US 20 westbound: Road construction, on ramps.
At I-15 (Idaho Falls). Road construction work is in progress. On ramps. Until September 16.
US 20 in both directions: Road construction, roadway reduced to one lane, speed restrictions in force, width limit in effect.
Between Exit 332: South Rexburg and Exit 337: Salem Road (near Rexburg). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 55 MPH. Width limit 14'0". Until September 11.
US 20 in both directions: Work on the shoulder.
Between The North Fork Teton River Bridge and Exit 346: Bridge Street (1 mile east of the Sugar City area). There is work on the shoulder. Until today at about 5:00PM MDT.
US 20: Intersecting road closed, because the bridge is closed, detour in operation.
Between Exit 346: Bridge Street and US Route 20 Business; 2600 East Road (1 mile east of the St. Anthony area). The intersecting road is closed because the bridge is closed. A detour is in operation. Until October 1.
US 20 in both directions: Work on the shoulder.
Between The South Ashton City Limits and The Truck Scale Port of Entry (5 miles west of the Ashton area). There is work on the shoulder. Until September 11.
US 20 in both directions: Road construction, roadway reduced to one lane, delays, speed restrictions in force, width limit in effect, look out for flaggers.
Between North River Road and Wood Road (4 to 7 miles east of the Ashton area). Road construction work is in progress. The roadway is reduced to one lane. Expect delays. Speed restrictions are in force. There is a width limit in effect. Look out for flaggers. Expect 30 - minute delays. Speed limit 45 MPH. Width limit 11'0". Until October 9.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 20: Idaho Falls to Montana
Map of Reports on US 20 Between Exit 332: South Rexburg and Exit 337: Salem Road (near Rexburg). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 55 MPH. Width limit 14'0". Until September 11. Between Exit 346: Bridge Street and US Route 20 Business; 2600 East Road (1 mile east of the St. Anthony area). The intersecting road is closed because the bridge is closed. A detour is in operation. Until October 1. Between North River Road and Wood Road (4 to 7 miles east of the Ashton area). Road construction work is in progress. The roadway is reduced to one lane. Expect delays. Speed restrictions are in force. There is a width limit in effect. Look out for flaggers. Expect 30 - minute delays. Speed limit 45 MPH. Width limit 11'0". Until October 9.
US 20 westbound: Road construction, on ramps.
US 20 in both directions: Road construction, roadway reduced to one lane, speed restrictions in force, width limit in effect.
US 20 in both directions: Work on the shoulder.
US 20: Intersecting road closed, because the bridge is closed, detour in operation.
US 20 in both directions: Work on the shoulder.
US 20 in both directions: Road construction, roadway reduced to one lane, delays, speed restrictions in force, width limit in effect, look out for flaggers.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info