Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Reports on US 95: New Meadows to Lewiston
US 95: New Meadows to Lewiston
Between County Road (14 miles north of the New Meadows area) and Pinehurst Road (11 miles south of the Riggins area). Road construction work is in progress. The roadway is reduced to one lane. Expect delays. Speed restrictions are in force. There is a width limit in effect. Width limit 14'0". Speed limit 35 MPH. Until September 11.
Between Sportsman Access Road and Sportsman Access Road (6 miles south of the White Bird area). Bridge construction work is in progress. The roadway is reduced to one lane. Look out for temporary traffic lights. Truck restrictions are in force. Width limit 14'0". Until September 1.
Between White Bird Creek Bridge (5 miles north of the White Bird area) and Lake Road (5 miles south of the Grangeville area). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. A pilot car is in operation. Look out for flaggers. Expect 15 - minute delays. Until September 5.
Between Cummins Road and Fernand South Road (near Ferdinand). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. A pilot car is in operation. Look out for flaggers. Look out for loose gravel on the roadway. Expect 15 - minute delays. Until September 9.