Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 95: New Meadows to Lewiston
US 95 in both directions: Bridge construction, roadway reduced to one lane, temporary traffic lights, truck restrictions in force.
Between Sportsman Access Road and Sportsman Access Road (6 miles south of the White Bird area). Bridge construction work is in progress. The roadway is reduced to one lane. Look out for temporary traffic lights. Truck restrictions are in force. Width limit 14'0". Until September 30.
US 95 in both directions: Road construction, work on the shoulder.
Between White Bird Creek Bridge (5 miles north of the White Bird area) and Lake Road (5 miles south of the Grangeville area). Road construction work is in progress. There is work on the shoulder. Until Friday, at about 7:00PM PDT.
US 95: Road construction, work on the shoulder, loose gravel.
Between Cummins Road and Fernand South Road (near Ferdinand). Road construction work is in progress. There is work on the shoulder. Look out for loose gravel on the roadway. Until Friday, at about 7:00PM PDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 95: New Meadows to Lewiston
Map of Reports on US 95 Between White Bird Creek Bridge (5 miles north of the White Bird area) and Lake Road (5 miles south of the Grangeville area). Road construction work is in progress. There is work on the shoulder. Until Friday, at about 7:00PM PDT. Between Cummins Road and Fernand South Road (near Ferdinand). Road construction work is in progress. There is work on the shoulder. Look out for loose gravel on the roadway. Until Friday, at about 7:00PM PDT.
US 95 in both directions: Bridge construction, roadway reduced to one lane, temporary traffic lights, truck restrictions in force.
US 95 in both directions: Road construction, work on the shoulder.
US 95: Road construction, work on the shoulder, loose gravel.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info