Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 95: New Meadows to Lewiston
US 95: Seal coat, roadway reduced to one lane, pilot car in operation, look out for flaggers, delays.
Between Carr Road (6 miles north of the Weiser area) and Rainbow Road (10 miles south of the Riggins area). A seal coat treatment has been applied. The roadway is reduced to one lane. A pilot car is in operation. Look out for flaggers. Expect delays. Speed limit 35 MPH. From 7:00AM MDT to 7:00PM MDT on Mondays, Tuesdays, Wednesdays and Thursdays. Until Thursday, at about 7:00PM MDT.
US 95 in both directions: Road construction, paving operations, look out for flaggers.
Between White Bird Creek Bridge and White Bird Hill Summit (5 miles north of the White Bird area). Road construction work is in progress. The road is being repaved. Look out for flaggers. Expect 15 - minute delays. From 6:00AM PDT to 6:00PM PDT on weekdays. Until July 6.
US 95: Road construction, consider using an alternate route, roadway reduced to one lane, look out for flaggers.
Between Ernie's Road and Grangeville Cut-Off Road (1 mile north of the Grangeville area). Road construction work is in progress. Consider using an alternate route. The roadway is reduced to one lane. Look out for flaggers. Expect 15 - minute delays. Until today at about 11:59PM PDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 95: New Meadows to Lewiston
Map of Reports on US 95 Between Carr Road (6 miles north of the Weiser area) and Rainbow Road (10 miles south of the Riggins area). A seal coat treatment has been applied. The roadway is reduced to one lane. A pilot car is in operation. Look out for flaggers. Expect delays. Speed limit 35 MPH. From 7:00AM MDT to 7:00PM MDT on Mondays, Tuesdays, Wednesdays and Thursdays. Until Thursday, at about 7:00PM MDT. Between White Bird Creek Bridge and White Bird Hill Summit (5 miles north of the White Bird area). Road construction work is in progress. The road is being repaved. Look out for flaggers. Expect 15 - minute delays. From 6:00AM PDT to 6:00PM PDT on weekdays. Until July 6. Between Ernie's Road and Grangeville Cut-Off Road (1 mile north of the Grangeville area). Road construction work is in progress. Consider using an alternate route. The roadway is reduced to one lane. Look out for flaggers. Expect 15 - minute delays. Until today at about 11:59PM PDT.
US 95: Seal coat, roadway reduced to one lane, pilot car in operation, look out for flaggers, delays.
US 95 in both directions: Road construction, paving operations, look out for flaggers.
US 95: Road construction, consider using an alternate route, roadway reduced to one lane, look out for flaggers.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info