Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 95: New Meadows to Lewiston
US 95: Road construction, roadway reduced to one lane, delays, speed restrictions in force, width limit in effect.
Between County Road (14 miles north of the New Meadows area) and Pinehurst Road (11 miles south of the Riggins area). Road construction work is in progress. The roadway is reduced to one lane. Expect delays. Speed restrictions are in force. There is a width limit in effect. Width limit 14'0". Speed limit 35 MPH. Until September 11.
US 95 in both directions: Bridge construction, roadway reduced to one lane, temporary traffic lights, truck restrictions in force.
Between Sportsman Access Road and Sportsman Access Road (6 miles south of the White Bird area). Bridge construction work is in progress. The roadway is reduced to one lane. Look out for temporary traffic lights. Truck restrictions are in force. Width limit 14'0". Until September 10.
US 95 in both directions: Road construction, work on the shoulder, roadway reduced to one lane, pilot car in operation, look out for flaggers.
Between White Bird Creek Bridge (5 miles north of the White Bird area) and Lake Road (5 miles south of the Grangeville area). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. A pilot car is in operation. Look out for flaggers. Expect 15 - minute delays. Until September 19.
US 95: Road construction, work on the shoulder, roadway reduced to one lane, pilot car in operation, look out for flaggers, loose gravel.
Between Cummins Road and Fernand South Road (near Ferdinand). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. A pilot car is in operation. Look out for flaggers. Look out for loose gravel on the roadway. Expect 15 - minute delays. Until September 9.
US 95 northbound: Roadway reduced to one lane, grass fire, through traffic must keep left.
Between 41st Street North and 36th Street North (Lewiston). The roadway is reduced to one lane. Look out for a grass fire. Through traffic must keep left.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 95: New Meadows to Lewiston
Map of Reports on US 95 Between County Road (14 miles north of the New Meadows area) and Pinehurst Road (11 miles south of the Riggins area). Road construction work is in progress. The roadway is reduced to one lane. Expect delays. Speed restrictions are in force. There is a width limit in effect. Width limit 14'0". Speed limit 35 MPH. Until September 11. Between White Bird Creek Bridge (5 miles north of the White Bird area) and Lake Road (5 miles south of the Grangeville area). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. A pilot car is in operation. Look out for flaggers. Expect 15 - minute delays. Until September 19. Between Cummins Road and Fernand South Road (near Ferdinand). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. A pilot car is in operation. Look out for flaggers. Look out for loose gravel on the roadway. Expect 15 - minute delays. Until September 9.
US 95: Road construction, roadway reduced to one lane, delays, speed restrictions in force, width limit in effect.
US 95 in both directions: Bridge construction, roadway reduced to one lane, temporary traffic lights, truck restrictions in force.
US 95 in both directions: Road construction, work on the shoulder, roadway reduced to one lane, pilot car in operation, look out for flaggers.
US 95: Road construction, work on the shoulder, roadway reduced to one lane, pilot car in operation, look out for flaggers, loose gravel.
US 95 northbound: Roadway reduced to one lane, grass fire, through traffic must keep left.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info