Between Exit 80: Fort Hall (Fort Hall) and Exit 93: US 26 (1 mile south of the Blackfoot area). The roadway is reduced to one lane. There are alternating lane closures. Look out for mobile maintenance operations. Road maintenance work is in progress. There is work on the shoulder. If weather permits. From 7:30AM MDT to 3:00PM MDT on Monday, Tuesday, Wednesday and Thursday. Until today at about 3:00PM MDT.
Between Exit 80: Fort Hall (Fort Hall) and Exit 93: US 26 (1 mile south of the Blackfoot area). The roadway is reduced to one lane. There are alternating lane closures. Look out for mobile maintenance operations. Road maintenance work is in progress. There is work on the shoulder. If weather permits. From 7:30AM MDT to 3:00PM MDT on Monday, Tuesday, Wednesday and Thursday. Until today at about 3:00PM MDT.
Comment: This crack sealing project is on I-15 between milepost 80, Fort Hall, and milepost 89, South Blackfoot Interchange. Northbound outside driving lane will be done first, followed by the inside lane. Once northbound is complete, southbound lanes will be done in the same order. Motorists should use caution around crews and equipment.
Last updated
yesterday at 10:40am MDT