Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-84: Boise to Twin Falls
I-84: Road construction, roadway reduced to two lanes, speed restrictions in force.
Between Exit 46: ID 55; Eagle Road and Exit 52: Orchard Street (near Boise). Road construction work is in progress. The roadway is reduced to two lanes. Speed restrictions are in force. Speed limit 55 MPH. From 10:00PM MDT to 7:00AM MDT on weekdays and Saturday. Until October 27, 2017 at about 5:00AM MDT.
I-84 eastbound: Road maintenance operations, roadway reduced to one lane.
Between Exit 64: Black's Creek Road and Exit 71: Mayfield Road (5 to 7 miles east of the Boise area). Road maintenance work is in progress. The roadway is reduced to one lane. Until today at about 5:00AM MDT.
I-84: Road construction, right lane closed, speed restrictions in force.
Between Exit 74: Simco Road and Exit 95: US 20; ID 51 (2 to 3 miles west of the Mountain Home area). Road construction work is in progress. The right lane is closed. Speed restrictions are in force. Speed limit 65 MPH. Until September 15, 2017 at about 6:00PM MDT.
I-84 westbound: Exit ramp closed.
At Exit 90: I-84B (2 miles west of the Mountain Home area). The exit ramp is closed. Until today at about 11:59PM MDT.
I-84: Road maintenance operations, alternating lane closures, speed restrictions in force, width limit in effect.
Between Exit 120: Bannock Avenue and Eastbound Bliss Rest Area (7 miles east of the Glenns Ferry area). Road maintenance work is in progress. There are alternating lane closures. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until September 29, 2017 at about 5:00PM MDT.
I-84 in both directions: Bridge inspection work is in progress, roadway reduced to one lane, alternating lane closures, width limit in effect.
Between Exit 125: 18th East Street and Exit 129: Parks Loop Road (5 to 6 miles east of the Glenns Ferry area). Bridge inspection work is in progress. The roadway is reduced to one lane. There are alternating lane closures. There is a width limit in effect. Width limit 16'0". From 8:00AM MDT to 5:30PM MDT on Monday, Tuesday, Wednesday and Thursday. Until today at about 5:30PM MDT.
I-84 in both directions: Work on the shoulder, construction work.
Between Exit 137: I-84B and Exit 147: 2350 South Road (near Bliss). There is work on the shoulder. Look out for construction work. Until September 1, 2017 at about 5:00PM MDT.
I-84 in both directions: Left lane closed, because of bridge maintenance work, paving operations, width limit in effect.
Between Exit 141: I-84B and Exit 147: 2350 South Road (4 to 5 miles east of the Bliss area). The left lane is closed because of bridge maintenance work. The road is being repaved. There is a width limit in effect. Width limit 14'0". Until September 15, 2017 at about 5:00PM MDT.
I-84: Paving operations, roadway reduced to two lanes, speed restrictions in force, width limit in effect, exit ramp closed, entrance ramp closed.
Between Exit 157: ID 46 (near Wendell) and Exit 168: Jerome/Lincoln Street (near Jerome). The road is being repaved. The roadway is reduced to two lanes. Speed restrictions are in force. There is a width limit in effect. The exit ramp is closed. The entrance ramp is closed. Speed limit 70 MPH. Width limit 14'0". Until October 20, 2017 at about 5:00PM MDT.
Switch to Truck Restrictions
Reports on I-84: Boise to Twin Falls
Map of Reports on I-84 Between Exit 46: ID 55; Eagle Road and Exit 52: Orchard Street (near Boise). Road construction work is in progress. The roadway is reduced to two lanes. Speed restrictions are in force. Speed limit 55 MPH. From 10:00PM MDT to 7:00AM MDT on weekdays and Saturday. Until October 27, 2017 at about 5:00AM MDT. Between Exit 64: Black's Creek Road and Exit 71: Mayfield Road (5 to 7 miles east of the Boise area). Road maintenance work is in progress. The roadway is reduced to one lane. Until today at about 5:00AM MDT. Between Exit 74: Simco Road and Exit 95: US 20; ID 51 (2 to 3 miles west of the Mountain Home area). Road construction work is in progress. The right lane is closed. Speed restrictions are in force. Speed limit 65 MPH. Until September 15, 2017 at about 6:00PM MDT. Between Exit 120: Bannock Avenue and Eastbound Bliss Rest Area (7 miles east of the Glenns Ferry area). Road maintenance work is in progress. There are alternating lane closures. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until September 29, 2017 at about 5:00PM MDT. Between Exit 125: 18th East Street and Exit 129: Parks Loop Road (5 to 6 miles east of the Glenns Ferry area). Bridge inspection work is in progress. The roadway is reduced to one lane. There are alternating lane closures. There is a width limit in effect. Width limit 16'0". From 8:00AM MDT to 5:30PM MDT on Monday, Tuesday, Wednesday and Thursday. Until today at about 5:30PM MDT. Between Exit 137: I-84B and Exit 147: 2350 South Road (near Bliss). There is work on the shoulder. Look out for construction work. Until September 1, 2017 at about 5:00PM MDT. Between Exit 141: I-84B and Exit 147: 2350 South Road (4 to 5 miles east of the Bliss area). The left lane is closed because of bridge maintenance work. The road is being repaved. There is a width limit in effect. Width limit 14'0". Until September 15, 2017 at about 5:00PM MDT. Between Exit 157: ID 46 (near Wendell) and Exit 168: Jerome/Lincoln Street (near Jerome). The road is being repaved. The roadway is reduced to two lanes. Speed restrictions are in force. There is a width limit in effect. The exit ramp is closed. The entrance ramp is closed. Speed limit 70 MPH. Width limit 14'0". Until October 20, 2017 at about 5:00PM MDT.
I-84: Road construction, roadway reduced to two lanes, speed restrictions in force.
I-84 eastbound: Road maintenance operations, roadway reduced to one lane.
I-84: Road construction, right lane closed, speed restrictions in force.
I-84 westbound: Exit ramp closed.
I-84: Road maintenance operations, alternating lane closures, speed restrictions in force, width limit in effect.
I-84 in both directions: Bridge inspection work is in progress, roadway reduced to one lane, alternating lane closures, width limit in effect.
I-84 in both directions: Work on the shoulder, construction work.
I-84 in both directions: Left lane closed, because of bridge maintenance work, paving operations, width limit in effect.
I-84: Paving operations, roadway reduced to two lanes, speed restrictions in force, width limit in effect, exit ramp closed, entrance ramp closed.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork Info Info