Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-84: Boise to Twin Falls
I-84: Road construction, bridge construction, roadway reduced to one lane, speed restrictions in force.
Between Exit 52: Orchard Street and Exit 57: Gowen Road (near Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. Speed limit 55 MPH. From 8:00PM MDT to 5:00AM MDT daily. Until December 1, 2015.
I-84: Road construction, bridge construction, work on the shoulder, work in the median, roadway reduced to one lane, speed restrictions in force, width limit in effect, detour in operation.
Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. People are working in the median. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. A detour is in operation. Speed limit 55 MPH. Width limit 12'0". Until October 1, 2015.
I-84 eastbound: Road maintenance operations, roadway reduced to one lane, right lane closed.
Between Exit 114: I-84B and Exit 120: Bannock Avenue (2 miles west of the Glenns Ferry area). Road maintenance work is in progress. The roadway is reduced to one lane. The right lane is closed. Until today at about 5:30PM MDT.
I-84 in both directions: Bridge maintenance operations, roadway reduced to one lane, speed restrictions in force, width limit in effect.
Between Exit 137 and Exit 141: I-84B; US 26 (near Bliss). Bridge maintenance work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 13'0". Until September 26.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-84: Boise to Twin Falls
Map of Reports on I-84 Between Exit 52: Orchard Street and Exit 57: Gowen Road (near Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. Speed limit 55 MPH. From 8:00PM MDT to 5:00AM MDT daily. Until December 1, 2015. Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. People are working in the median. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. A detour is in operation. Speed limit 55 MPH. Width limit 12'0". Until October 1, 2015. Between Exit 114: I-84B and Exit 120: Bannock Avenue (2 miles west of the Glenns Ferry area). Road maintenance work is in progress. The roadway is reduced to one lane. The right lane is closed. Until today at about 5:30PM MDT. Between Exit 137 and Exit 141: I-84B; US 26 (near Bliss). Bridge maintenance work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 13'0". Until September 26.
I-84: Road construction, bridge construction, roadway reduced to one lane, speed restrictions in force.
I-84: Road construction, bridge construction, work on the shoulder, work in the median, roadway reduced to one lane, speed restrictions in force, width limit in effect, detour in operation.
I-84 eastbound: Road maintenance operations, roadway reduced to one lane, right lane closed.
I-84 in both directions: Bridge maintenance operations, roadway reduced to one lane, speed restrictions in force, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info