Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Reports on US 20
US 20
Between Cloverdale Road - Joplin Road and Joplin Road (near Boise). Road maintenance work is in progress. Until Tuesday, at about 4:00PM MDT.
Between ID 33 and Van Buren Boulevard (5 to 8 miles east of the Butte City area). Look out for large animals on the roadway. Drive with extreme caution.
At I-15 (Idaho Falls). Road construction work is in progress. On ramps. There is work on the shoulder. Until September 26.
Between Exit 346: Bridge Street and US Route 20 Business; 2600 East Road (1 mile east of the St. Anthony area). The intersecting road is closed because the bridge is closed. A detour is in operation. Until October 1.
Between North River Road and Wood Road (4 to 7 miles east of the Ashton area). Road construction work is in progress. The roadway is reduced to one lane. Expect delays. Speed restrictions are in force. There is a width limit in effect. Look out for flaggers. Expect 30 - minute delays. Speed limit 45 MPH. Width limit 11'0". Until October 9.