Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Reports on US 20
US 20
At Ten Mile Road (2 miles west of the Eagle area). Road construction work is in progress. Until August 29.
Between 12th Street and Ninth Street (Boise). There is work on the shoulder. The left lane is closed. Until August 31.
Between Cat Creek Summit (26 miles west of the Fairfield area) and First Street West (Fairfield). The road is wet. Expect rain.
Between Second Street West (Fairfield) and The Timmerman Rest Area (19 miles west of the Carey area). The road is wet. Expect rain.
Between Lava Lake Road and Blizzard Mountain Road (18 miles east of the Carey area). There is work on the shoulder.
Between ID 33 and Van Buren Boulevard (5 to 8 miles east of the Butte City area). Look out for large animals on the roadway. Drive with extreme caution.
Between Exit 309: Science Drive and Exit 310: Lewisville Highway; US Route 20 Business (near Idaho Falls). Utility work is in progress. Until Tuesday, at about 6:00PM MDT.
Between Exit 332: South Rexburg and Exit 337: Salem Road (near Rexburg). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 55 MPH. Width limit 14'0". Until September 11.
Between Exit 346: Bridge Street and US Route 20 Business; 2600 East Road (1 mile east of the St. Anthony area). The intersecting road is closed because the bridge is closed. A detour is in operation. Until October 1.
Between North River Road and Wood Road (4 to 7 miles east of the Ashton area). Road construction work is in progress. The roadway is reduced to one lane. Expect delays. Speed restrictions are in force. There is a width limit in effect. Look out for flaggers. Expect 30 - minute delays. Speed limit 45 MPH. Width limit 11'0". Until October 9.