Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 2
US 2: Road construction, temporary three-way stop condition.
Between 11th Street and McKinley Street (near Priest River). Road construction work is in progress. There is a temporary three way stop condition. Until June 10.
US 2: Road construction, work on the shoulder, look out for flaggers.
Between Westwood Drive and Pine Street (Sandpoint). Road construction work is in progress. There is work on the shoulder. Look out for flaggers. Until July 15.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 2
Map of Reports on US 2 Between 11th Street and McKinley Street (near Priest River). Road construction work is in progress. There is a temporary three way stop condition. Until June 10. Between Westwood Drive and Pine Street (Sandpoint). Road construction work is in progress. There is work on the shoulder. Look out for flaggers. Until July 15.
US 2: Road construction, temporary three-way stop condition.
US 2: Road construction, work on the shoulder, look out for flaggers.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info