Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-84
I-84 westbound: Stop and go traffic.
Between Exit 44: ID 69 and Exit 29: US 20; Franklin Road (near Nampa). Traffic is stop and go.
I-84 in both directions: Bridge inspection work is in progress, roadway reduced to one lane, alternating lane closures, speed restrictions in force, width limit in effect.
Between Exit 141: I-84B and Exit 147: 2350 South Road (5 miles east of the Bliss area). Bridge inspection work is in progress. The roadway is reduced to one lane. There are alternating lane closures. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 18'0". From 7:00AM MDT to 6:00PM MDT on Wednesday, Thursday and Friday. Until today at about 6:00PM MDT.
I-84 in both directions: Paving operations, roadway reduced to two lanes, speed restrictions in force, width limit in effect.
Between Exit 194: ID 25; Ridgeway Road (3 miles east of the Hazelton area) and Exit 201: ID 25; Kasota Road (6 miles west of the Burley area). The road is being repaved. The roadway is reduced to two lanes. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 15'0". Until July 15.
I-84 in both directions: Long term road construction, due to bridge construction work, roadway reduced to two lanes, speed restrictions in force, width limit in effect, drive with extreme caution.
Between Exit 211: US 30; ID 24 and Exit 222: I-86 (5 to 6 miles east of the Heyburn area). Look out for long term road construction work due to bridge construction work. The roadway is reduced to two lanes. Speed restrictions are in force. There is a width limit in effect. Drive with extreme caution. Speed limit 65 MPH. Width limit 12'0". Until June 2, 2017.
I-84 westbound: Entrance ramp closed, due to a new road construction layout, due to bridge construction work, detour in operation.
At Exit 216: ID 25; ID 77 (5 miles east of the Heyburn area). The entrance ramp is closed due to a new road construction layout and due to bridge construction work. A detour is in operation. Until August 1.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-84
Map of Reports on I-84 Between Exit 44: ID 69 and Exit 29: US 20; Franklin Road (near Nampa). Traffic is stop and go. Between Exit 194: ID 25; Ridgeway Road (3 miles east of the Hazelton area) and Exit 201: ID 25; Kasota Road (6 miles west of the Burley area). The road is being repaved. The roadway is reduced to two lanes. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 15'0". Until July 15. Between Exit 211: US 30; ID 24 and Exit 222: I-86 (5 to 6 miles east of the Heyburn area). Look out for long term road construction work due to bridge construction work. The roadway is reduced to two lanes. Speed restrictions are in force. There is a width limit in effect. Drive with extreme caution. Speed limit 65 MPH. Width limit 12'0". Until June 2, 2017.
I-84 westbound: Stop and go traffic.
I-84 in both directions: Bridge inspection work is in progress, roadway reduced to one lane, alternating lane closures, speed restrictions in force, width limit in effect.
I-84 in both directions: Paving operations, roadway reduced to two lanes, speed restrictions in force, width limit in effect.
I-84 in both directions: Long term road construction, due to bridge construction work, roadway reduced to two lanes, speed restrictions in force, width limit in effect, drive with extreme caution.
I-84 westbound: Entrance ramp closed, due to a new road construction layout, due to bridge construction work, detour in operation.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info