US 95: Road closed to traffic, bridge construction, speed restrictions in force, intersecting road closed.
Between Iest Road and US 20 (1 mile south of the Parma area). The road is closed to traffic. Bridge construction work is in progress. Speed restrictions are in force. The intersecting road is closed. Speed limit 45 MPH. Until December 1, 2017 at about 7:00PM MDT.
US 95: Bridge construction, roadway reduced to one lane, delays, look out for flaggers, width limit in effect, speed restrictions in force.
Between Jackson Creek Road (near Council) and Little Mud Creek Road (2 miles south of the New Meadows area). Bridge construction work is in progress. The roadway is reduced to one lane. Expect delays. Look out for flaggers. There is a width limit in effect. Speed restrictions are in force. Width limit 11'0". Speed limit 35 MPH. Expect 30 - minute delays. Until November 30, 2017 at about 7:00PM MDT.
US 95: Road construction, work on the shoulder, look out for flaggers.
Between Jackson Creek Road and Whitleley Avenue (near Council). Road construction work is in progress. There is work on the shoulder. Look out for flaggers. Expect 15 - minute delays. From 5:00AM MDT to 5:00PM MDT on weekdays. Until August 15, 2017 at about 7:00PM MDT.
US 95: Road construction, paving operations, work on the shoulder, roadway reduced to one lane, speed restrictions in force, width limit in effect.
Between Smokey Boulder Road and Hazard Creek Road (10 to 12 miles north of the New Meadows area). Road construction work is in progress. The road is being repaved. There is work on the shoulder. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Width limit 12'0". Speed limit 35 MPH. Until September 15, 2017 at about 5:00PM MDT.
US 95: Bridge construction, roadway reduced to one lane, observe signals, speed restrictions in force.
Between Smokey Boulder Road and County Road (15 miles north of the New Meadows area). Bridge construction work is in progress. The roadway is reduced to one lane. Observe the signals. Speed restrictions are in force. Speed limit 45 MPH. Until November 15, 2017 at about 5:00PM MDT.
US 95 in both directions: Paving operations, work on the shoulder, look out for flaggers, roadway reduced to one lane.
Between Exit 304: US 12 (3 miles north of the Lapwai area) and Frontage Road (near Lewiston). The road is being repaved. There is work on the shoulder. Look out for flaggers. The roadway is reduced to one lane. Expect 15 - minute delays. From 4:00AM PDT to 3:00PM PDT on weekdays. Until September 12, 2017 at about 6:00PM PDT.
US 95 in both directions: Paving operations, work on the shoulder, roadway reduced to one lane, look out for flaggers, drive with extreme caution.
Between Cameron Road and C Street (near Moscow). The road is being repaved. There is work on the shoulder. The roadway is reduced to one lane. Look out for flaggers. Drive with extreme caution. From 4:00AM PDT to 4:00PM PDT on weekdays. Until September 29, 2017 at about 7:00PM PDT.
US 95: Construction work, look out for flaggers, delays, stop and go traffic, width limit in effect, truck restrictions in force.
Between Sanders-Emida Road and Desmet Road (2 to 4 miles south of the Tensed area). Look out for construction work. Look out for flaggers. Expect delays. Traffic is stop and go. There is a width limit in effect. Truck restrictions are in force. Width limit 12'0".
US 95: Bridge construction, roadway reduced to one lane.
Between Johnson Road and First Street (near Tensed). Bridge construction work is in progress. The roadway is reduced to one lane. Expect 5 - minute delays. Speed limit 35 MPH. Width limit 12'0". Until September 15, 2017 at about 5:00PM PDT.
US 95 in both directions: Alternating lane closures, road maintenance operations, drive with extreme caution.
Between Johnston Road and County Line Road (near Plummer). There are alternating lane closures. Road maintenance work is in progress. Drive with extreme caution. Until today at about 6:00PM PDT.
US 95: Construction work.
Between Emma Avenue and Ironwood Drive (Coeur d'Alene). Look out for construction work. From 4:00AM PDT to 2:00PM PDT on weekdays. Until August 31, 2017 at about 4:00PM PDT.
US 95 in both directions: Bridge construction, work on the shoulder, look out for flaggers, stop and go traffic.
Between Cocolalla Creek-Blacktail Road and Cocolalla Loop Road (7 to 9 miles north of the Athol area). Bridge construction work is in progress. There is work on the shoulder. Look out for flaggers. Traffic is stop and go. Width limit 14'0". Expect 17 - minute delays. Speed limit 35 MPH. Until September 29, 2017 at about 11:59PM PDT.
US 95: Road construction, detour in operation, speed restrictions in force.
Between Cocolalla Creek-Blacktail Road and Cocolalla Loop Road (8 miles north of the Athol area). Road construction work is in progress. A detour is in operation. Speed restrictions are in force. Speed limit 35 MPH. Until October 1, 2017 at about 5:00AM PDT.
US 95: Road open to traffic, a mandatory speed limit is in force.
Between County Road 5; County Road 7 and County Road 8 (6 miles south of the Bonners Ferry area). The road is open to traffic. A mandatory speed limit is in force.
US 95: Rough road.
Between County Road 2C and Chinook Street (near Bonners Ferry). The road is rough.
US 95 in both directions: Road construction, paving operations, bridge construction, work on the shoulder, roadway reduced to one lane, speed restrictions in force, width limit in effect, truck restrictions in force.
Between ID 1 and The Canadian Border (17 to 27 miles north of the Bonners Ferry area). Road construction work is in progress. The road is being repaved. Bridge construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Truck restrictions are in force. Truck speed limit 25 MPH. Speed limit 25 MPH. Width limit 11'0".
Switch to Truck Restrictions
Reports on US 95
Map of Reports on US 95 Between Jackson Creek Road (near Council) and Little Mud Creek Road (2 miles south of the New Meadows area). Bridge construction work is in progress. The roadway is reduced to one lane. Expect delays. Look out for flaggers. There is a width limit in effect. Speed restrictions are in force. Width limit 11'0". Speed limit 35 MPH. Expect 30 - minute delays. Until November 30, 2017 at about 7:00PM MDT. Between Jackson Creek Road and Whitleley Avenue (near Council). Road construction work is in progress. There is work on the shoulder. Look out for flaggers. Expect 15 - minute delays. From 5:00AM MDT to 5:00PM MDT on weekdays. Until August 15, 2017 at about 7:00PM MDT. Between Smokey Boulder Road and Hazard Creek Road (10 to 12 miles north of the New Meadows area). Road construction work is in progress. The road is being repaved. There is work on the shoulder. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Width limit 12'0". Speed limit 35 MPH. Until September 15, 2017 at about 5:00PM MDT. Between Exit 304: US 12 (3 miles north of the Lapwai area) and Frontage Road (near Lewiston). The road is being repaved. There is work on the shoulder. Look out for flaggers. The roadway is reduced to one lane. Expect 15 - minute delays. From 4:00AM PDT to 3:00PM PDT on weekdays. Until September 12, 2017 at about 6:00PM PDT. Between Cameron Road and C Street (near Moscow). The road is being repaved. There is work on the shoulder. The roadway is reduced to one lane. Look out for flaggers. Drive with extreme caution. From 4:00AM PDT to 4:00PM PDT on weekdays. Until September 29, 2017 at about 7:00PM PDT. Between Sanders-Emida Road and Desmet Road (2 to 4 miles south of the Tensed area). Look out for construction work. Look out for flaggers. Expect delays. Traffic is stop and go. There is a width limit in effect. Truck restrictions are in force. Width limit 12'0". Between Johnston Road and County Line Road (near Plummer). There are alternating lane closures. Road maintenance work is in progress. Drive with extreme caution. Until today at about 6:00PM PDT. Between Cocolalla Creek-Blacktail Road and Cocolalla Loop Road (7 to 9 miles north of the Athol area). Bridge construction work is in progress. There is work on the shoulder. Look out for flaggers. Traffic is stop and go. Width limit 14'0". Expect 17 - minute delays. Speed limit 35 MPH. Until September 29, 2017 at about 11:59PM PDT. Between County Road 2C and Chinook Street (near Bonners Ferry). The road is rough. Between ID 1 and The Canadian Border (17 to 27 miles north of the Bonners Ferry area). Road construction work is in progress. The road is being repaved. Bridge construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Truck restrictions are in force. Truck speed limit 25 MPH. Speed limit 25 MPH. Width limit 11'0".
US 95: Road closed to traffic, bridge construction, speed restrictions in force, intersecting road closed.
US 95: Bridge construction, roadway reduced to one lane, delays, look out for flaggers, width limit in effect, speed restrictions in force.
US 95: Road construction, work on the shoulder, look out for flaggers.
US 95: Road construction, paving operations, work on the shoulder, roadway reduced to one lane, speed restrictions in force, width limit in effect.
US 95: Bridge construction, roadway reduced to one lane, observe signals, speed restrictions in force.
US 95 in both directions: Paving operations, work on the shoulder, look out for flaggers, roadway reduced to one lane.
US 95 in both directions: Paving operations, work on the shoulder, roadway reduced to one lane, look out for flaggers, drive with extreme caution.
US 95: Construction work, look out for flaggers, delays, stop and go traffic, width limit in effect, truck restrictions in force.
US 95: Bridge construction, roadway reduced to one lane.
US 95 in both directions: Alternating lane closures, road maintenance operations, drive with extreme caution.
US 95: Construction work.
US 95 in both directions: Bridge construction, work on the shoulder, look out for flaggers, stop and go traffic.
US 95: Road construction, detour in operation, speed restrictions in force.
US 95: Road open to traffic, a mandatory speed limit is in force.
US 95: Rough road.
US 95 in both directions: Road construction, paving operations, bridge construction, work on the shoulder, roadway reduced to one lane, speed restrictions in force, width limit in effect, truck restrictions in force.