Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-15
I-15 in both directions: Roadway reduced to one lane, road construction, delays, detour in operation, follow the detour signs, speed restrictions in force, width limit in effect.
Between Exit 17: ID 36; State Highway 36 (2 miles north of the Malad City area) and Exit 31: ID 40; Downey Road (11 miles south of the Arimo area). The roadway is reduced to one lane. Road construction work is in progress. Expect delays. A detour is in operation. Follow the detour signs. Speed restrictions are in force. There is a width limit in effect. Expect 15 - minute delays. Speed limit 65 MPH. Width limit 12'0". From 6:00AM MDT to 6:00PM MDT on weekdays. Until September 16.
I-15 in both directions: Roadway reduced to one lane, blasting, road construction, consider using an alternate route, pilot car in operation, delays, width limit in effect.
Between The Inkom Port of Entry and Exit 69: Clark Street (1 mile south of the Pocatello area). The roadway is reduced to one lane. Blasting is in progress. Road construction work is in progress. Consider using an alternate route. A pilot car is in operation. Expect delays. There is a width limit in effect. Expect 5 - minute delays. Width limit 16'0". From 7:00AM MDT to 7:00PM MDT on weekdays. Until December 15.
I-15 northbound: Roadway reduced to one lane, alternating lane closures, paving operations, width limit in effect.
Between Exit 89: US 91; Interstate 15 Business and Exit 93: US 26 (1 mile south of the Blackfoot area). Roadway reduced to one lane. Alternating lane closures. Paving operations. Width limit in effect. Width limit 12'0". From 7:00AM MDT to 7:00PM MDT on Tuesday and Wednesday. Starting 7:00AM MDT, 8/4/2015 until Wednesday, at about 7:00PM MDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-15
Map of Reports on I-15 Between Exit 17: ID 36; State Highway 36 (2 miles north of the Malad City area) and Exit 31: ID 40; Downey Road (11 miles south of the Arimo area). The roadway is reduced to one lane. Road construction work is in progress. Expect delays. A detour is in operation. Follow the detour signs. Speed restrictions are in force. There is a width limit in effect. Expect 15 - minute delays. Speed limit 65 MPH. Width limit 12'0". From 6:00AM MDT to 6:00PM MDT on weekdays. Until September 16. Between The Inkom Port of Entry and Exit 69: Clark Street (1 mile south of the Pocatello area). The roadway is reduced to one lane. Blasting is in progress. Road construction work is in progress. Consider using an alternate route. A pilot car is in operation. Expect delays. There is a width limit in effect. Expect 5 - minute delays. Width limit 16'0". From 7:00AM MDT to 7:00PM MDT on weekdays. Until December 15. Between Exit 89: US 91; Interstate 15 Business and Exit 93: US 26 (1 mile south of the Blackfoot area). Roadway reduced to one lane. Alternating lane closures. Paving operations. Width limit in effect. Width limit 12'0". From 7:00AM MDT to 7:00PM MDT on Tuesday and Wednesday. Starting 7:00AM MDT, 8/4/2015 until Wednesday, at about 7:00PM MDT.
I-15 in both directions: Roadway reduced to one lane, road construction, delays, detour in operation, follow the detour signs, speed restrictions in force, width limit in effect.
I-15 in both directions: Roadway reduced to one lane, blasting, road construction, consider using an alternate route, pilot car in operation, delays, width limit in effect.
I-15 northbound: Roadway reduced to one lane, alternating lane closures, paving operations, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info