Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Reports on US 95
US 95
Between Jackson Creek Road and Whitleley Avenue (near Council). Road construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Expect delays. A detour is in operation. From 7:00AM MDT to 7:00PM MDT on weekdays. Until May 18, 2017.
Between 45th Parallel Road (3 miles north of the New Meadows area) and Pinehurst Road (11 miles south of the Riggins area). Look out for mobile maintenance operations. Expect delays.
Between Sky Line Drive and Martin Road (4 to 8 miles south of the Tensed area). Road construction work is in progress. Expect delays. Look out for flaggers. Speed limit 35 MPH. Width limit 11'0". Until October 31.
Between A Street (1 mile north of the Plummer area) and First Street (near Worley). The road is being repaved. The roadway is reduced to one lane. Expect delays. A pilot car is in operation. Speed limit 45 MPH. Until September 21.
Between Lakeshore Drive (1 mile south of the Sandpoint area) and Sandcreek Bypass Bridge (Sandpoint). Road construction work is in progress. The road is being repaved. Be aware of narrow lanes. There is a width limit in effect. The roadway is reduced to one lane. Width limit 12'0". Speed limit 35 MPH. Until Wednesday, at about 6:00AM PDT.