Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 3
ID 3: Road construction, roadway reduced to one lane, pilot car in operation, look out for flaggers, width limit in effect, delays.
Between First Avenue (Deary) and ID 8; The Junction of Highway 3 and Highway 8 in Bovill (Bovill). Road construction work is in progress. The roadway is reduced to one lane. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Expect delays. Width limit 12'0". Expect 15 - minute delays. Until September 25.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on ID 3
Map of Reports on ID 3 Between First Avenue (Deary) and ID 8; The Junction of Highway 3 and Highway 8 in Bovill (Bovill). Road construction work is in progress. The roadway is reduced to one lane. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Expect delays. Width limit 12'0". Expect 15 - minute delays. Until September 25.
ID 3: Road construction, roadway reduced to one lane, pilot car in operation, look out for flaggers, width limit in effect, delays.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info