Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Reports on I-84
I-84
At Exit 38: I-84B (Nampa). Road construction work is in progress. On the on ramp. The roadway is reduced to one lane. Speed limit 35 MPH. From 10:00PM MDT to 5:00AM MDT on weekdays. Until June 6.
Between Exit 121 and Exit 125: 18th East Street (near Glenns Ferry). Bridge maintenance work is in progress. There are alternating lane closures. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 14'0". Until June 16.
Between Exit 125: 18th East Street and Exit 129: Parks Loop Road (5 to 6 miles east of the Glenns Ferry area). Bridge maintenance work is in progress. There are alternating lane closures. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 14'0". Until June 16.
Between Exit 211: US 30; ID 24 and Exit 222: I-86 (5 to 6 miles east of the Heyburn area). Look out for long term road construction work due to bridge construction work. The roadway is reduced to two lanes. Speed restrictions are in force. There is a width limit in effect. Drive with extreme caution. Speed limit 65 MPH. Width limit 12'0". Until June 2, 2017.
Between Sweetzer Summit and The Utah State Line (57 to 65 miles east of the Heyburn area). The road is being repaved. The roadway is reduced to two lanes. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 14'0". Until July 29.